32
Section IV
– Pipeline Under Pressure
2.0 Continued
2.4 Installing the Drilling Machine
A. Apply thread paste (pipe dope) on the threaded
drilling machine adapter (Figure 4.18).
B. Install the drilling machine on the valve.
Flanged Valves
: Install a new gasket.
C.
Threaded Valves
: Tighten the drilling machine
assembly wrench-tight. Apply the pipe wrench to
the adapter only (Figure 4.19). Do not apply the
wrench to the drilling machine.
D.
Threaded Valves
: Measure from the face of the
valve to the mark made on the adapter (Figure
4.20). Record this as Measurement “G.”
E. Measurement “K” for the PIG-SIG V is always
equal to 1-7/8 inches.
Figure 4.18. Apply Thread
Paste
Figure 4.19. Tighten
Drilling Machine
Figure 4.20.
Measurement “G”
NOTE
:
On all flanges above 500-psi working pressure, use a new
Flex-Type, Elastograph or equal gasket on all connections.
On RTJ Flanges, use a new RTJ gasket.
⚠
CAUTION
Do not over-tighten the drilling
machine. Do not let the tapping valve
rotate during tightening.
Содержание PIG-SIG V
Страница 1: ...00 3795 0384 January 2018 Operating and Maintenance Instructions PIG SIG V Scraper Passage Indicator...
Страница 5: ...2018 All rights reserved T D Williamson Inc ii This page intentionally left blank...
Страница 7: ...2 Section I Safety This page intentionally left blank...
Страница 25: ...20 Section III Pipeline Not Under Pressure This page intentionally left blank...
Страница 71: ...66 Section VII Maintenance This page intentionally left blank...