background image

11

V

ersa

s

afe

TM

 I

nsTallaTIon

10.

 Ensure the unit is as level as possible given the floor conditions. Use a bubble level to verify 

this. If a bubble-level is not available, the cabinet can be “rocked” gently from front-to-back 

and side-to-side to check the need for leveling.  

11

. Use an adjustable wrench or a ratchet wrench with 3/4” [19mm] socket to tighten the nuts 

down. 

No minimum torque setting for the nuts is required. 

Simply ensure the nuts are 

tightened down firmly enough to secure the cabinet to the anchors. Tightening the nuts just 

beyond hand tight should prove adequate.

12.

 Once the unit is square (level), install a second nut on each bolt and tighten down firmly.

Base Material Temperature

Setting Time

68

o

 F/ 20

o

 C or above

20 minutes

50

o

 F/ 10

o

 C to 68

o

 F/ 20

o

 C

30 minutes

32

o

 F/ 0

o

 C to 50

o

 F/ 10

o

 C

1 hour

23

o

 F/ -5

o

 C to 32

o

 F/ 0

o

 C

5 hours

14

o

 F/ -10

o

 C to 23

o

 F/ -5

o

 C

10 hours

Figure 7

9.

 

Allow the adhesive to cure for the specified time (see chart and important note, which follows) 

prior to applying any load to the anchors. During the winter, the hole temperature may be 

different than the room temperature! The hole temperature should be measured to determine 

the curing time required. 

DO NOT disturb or load the anchors until they are fully cured! 

(If in doubt wait)

7.

 

Pull the driver out of the coupling while holding the rod. Hold the hex nut with a wrench to 

unthread the coupler.

8.

  Repeat steps 1-7 for each of the remaining mounting holes.

6.

 

Insert the chisel point of the rod into the hole to break the glass capsule. Spin it into the capsule 

at a speed of 

250 to 500 RPM

, until it is fully embedded. 

IMPORTANT! Turn the rotary 

hammer drill OFF IMMEDIATELY when the rod is fully embedded or it will strip out!

4.

 

Thread the rod coupler onto the threaded rod until it is tight against the nut. The threaded rod 

used should be free of dirt, grease, oil or other foreign material.

5.

  Select the drive unit, insert it into a rotary hammer drill and engage the coupling to be used.

Curing times and temperatures

Содержание Triton VersaSafe

Страница 1: ...on and Installation TDN 07103 00335 May 17 2012 Corporate Headquarters 21405 B Street Long Beach MS 39560 PHONE 800 259 6672 FAX 228 868 9445 2012 Triton All Rights Reserved TRITON logo is a registere...

Страница 2: ...Describes anchoring the cabinet using standard steel or the optional chemical anchors Anchors provided separately Power and Communication Shows cable access area power requirements and powering up th...

Страница 3: ...mizes the possibility of liquid or food spills 2 Site wiring power communication Ensure access will not be hindered by cabinet placement 3 Location of other equipment that may cause electrical electro...

Страница 4: ...ted ground Dedicated source TheVersaSafe AC power feed will be a dedicated line to which no other electrical devices are connected The VersaSafe power line will be wired for a single duplex style outl...

Страница 5: ...ess Unit shown with Bill Acceptor bracket extended En sure there is adequate room for the door to swing open DO NOT be tempted to place the cabi net on a table or other support Severe injury and equip...

Страница 6: ...6 VersaSafeTM Installation Dimensions Deep Cabinet Physical Dimensions...

Страница 7: ...nstalled 10 Remove the 4 four bolts and or nuts retaining the unit to the pallet UNLOCKING COMBINATION LOCKS Electronic Lock The combination of the lock is preset to 1 2 3 4 5 6 To unlock enter the pr...

Страница 8: ...he previous step Drill the pilot holes approximately 1 2 12 mm deep into the floor These holes will help guide the masonry bit that will be used to drill the anchor bolt holes in the next step 3 Stand...

Страница 9: ...to mounting holes Tap anchor mounts into mounting holes 4 Place a bolt into mount then place flat washer on the anchor bolt followed by a 1 2 13mm nut on top to secure Do not tighten fully allow for l...

Страница 10: ...the cabinet not to be level 2 Begin by inserting a Chem Stud capsule into one of the mounting holes Either end of the capsule may be inserted first 3 Place a washer and a nut in that order onto a chis...

Страница 11: ...dhesive to cure for the specified time see chart and important note which follows prior to applying any load to the anchors During the winter the hole temperature may be different than the room temper...

Страница 12: ...ords are not recommended 2 AC power for the terminal should come from a dedicated source with an isolated ground The unit is designed to work on an IT Isolated Terra type power system having a phase t...

Страница 13: ...board and serve as its power supply Use TY wraps to bundle cables if necessary The TDL Gateway modem will mount atop the units power supply A USB cable will provide power to the unit from the system s...

Страница 14: ...height Ensure the four 4 mounting points between the VersaSafeTM and the Plinth are secure Do not be tempt ed to use less than the four 4 pieces of hardware supplied If more than one Plinth is used en...

Страница 15: ...Appendix A Software License Agreement Compliance Emission Statements A 1...

Страница 16: ...ense to use the ATM Software but only in connection with the operation of this ATM subject to the terms and restrictions set forth in this License Agreement You are not permitted to use the ATM Softwa...

Страница 17: ...R REPRESENTATIVE HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAM AGES OR FOR ANY CLAIM BY ANY THIRD PARTY YOUR SOLE REMEDYAGAINSTTRITON FOR DEFECTIVE PERFORMANCE OFTHEATM SOFTWARE WILL BE LIMITED EXCL...

Страница 18: ...otection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in a...

Страница 19: ...Appendix B Warranty Service Statement B 1...

Страница 20: ...AR PURCHASE LIMITATION OF LIABILITY IN NO EVENT SHALL MANUFACTURER BE LIABLE FOR LOSS OF PROFITS OR INCIDENTAL INDIRECT SPECIAL CONSEQUENTIAL OR OTHER SIMILAR DAMAGES ARISING OUT OF ANY BREACH OF THIS...

Страница 21: ...ibutor s use of the goods or any of their parts by reason of infringement of a patent or other intellectual property right or if in Manufacturer s opinion the goods are likely to become the subject of...

Страница 22: ...code on a unit or any component thereof or any attempt to repair a unit or to repair or replace any component by anyone other than a service technician authorized by Triton shall void this warranty W...

Страница 23: ...ment is shipped Free On Board FOB Triton s facilities The organization or individual who has purchased the equipment assumes responsibility for the equipment once it leaves Triton s facilities Should...

Страница 24: ...d Therefore we will not ship primary structural parts such as a cabinet head or main cabinet body for repair in the field Triton s Technical Services Department The primary purpose of the Technical Se...

Страница 25: ...fication as a service technician or the serial number of a Triton terminal Technical support is provided during normal business hours for the life of the product When calling for help with an operatio...

Страница 26: ...B 8 Appendix B This Page Intentionally Left Blank...

Отзывы: