R
2800 LAURA LANE • MIDDLETON, WI 53562 • (800) 288-9383 • FAX (608) 836-9044 • www.tcsbasys.com
8
Rev:0616
Refer to the Ubiquity Manual for further information
Checkout & Troubleshooting
CHECKOUT
1. Be sure to check and verify all wiring before powering
the QD2010a.
2. Apply power.
3. If the QD2010a has not been pre-programmed, it can
be programmed at this time.
4. The unit is now ready for operation.
TROUBLESHOOTING
No Communications with Controllers on the network
Make sure the baud rate selection for the QD2010a is
set to match the baud rate of all the controllers on each
port network. All controllers on the network must have
a unique address, excluding the address ‘248’. Network
wiring should also be checked.