2-19
(1)
(2)
A
Fig. 2.56
Fig. 2.57
■
REINSTALLATION
①
Hoist the counterweight (1) and place it in its
mounting position at the rear section of the
frame (2).
Align section A of the frame with the recess
of the counterweight.
(kg [lbs])
3.5 tons
2044 [4506]
4.0 tons
2474 [5454]
4.5 tons
2764 [6094]
5.0 tons
2764 [6094]
②
Secure the counterweight in place using the
bolts (1), spring washers (2), and washers (3).
417 - 624 N-m {42.5 - 63.6 kgf-m}
[307.6 - 460.2 lbf-ft]
Apply LOCTITE #572.
Содержание FD35C9
Страница 2: ......
Страница 4: ...Empty page...
Страница 6: ...Empty page...
Страница 8: ......
Страница 44: ...2...
Страница 112: ...2 68 Fig 2 182 Connect the hoses 2 to the lift cylinders 1 2...
Страница 114: ...2...
Страница 208: ...3 94 Fig 3 299 Remove the tapered roller bearing cup 2 from the hub 1...
Страница 282: ...2...
Страница 290: ......
Страница 291: ......