2.6.2.2 If the Outdoor Unit Is Installed Higher than the Indoor Unit:
It is recommended that vertical suction risers not be upsized. Proper oil return to the compressor
shouId be maintained with suction gas velocity. If velocities drop below 7.62m/s(1 500fpm (feet per
minute)), oil return will be decreased.
An oil trap should be installed every 6m(20ft) of vertical suction line riser.
2.6.3 The Procedure of Connecting Pipes
2.6.3.1 Choose the Pipe Size according to the Specification Table.
2.6.3.2 Confirm the Cross Way of the Pipes.
2.6.3.3 Measure the Necessary Pipe Length.
2.6.3.4 Cut the Selected Pipe with Pipe Cutter
Make the section flat and smooth.
90
Lean
Crude
Burr
o
2.6.3.5 Insulate the Copper Pipe
Before test operation, the joint parts should not be heat insulated.
2.6.3.6 Flare the Pipe
Insert a flare nut into the pipe before flaring the pipe
Содержание TCC-09C2HRH/DV
Страница 7: ...TCL Air Conditioner Service Manual 7 MODEL TCC 18C2HRH DV PCB EEV...
Страница 26: ...TCL Air Conditioner Service Manual 26...
Страница 27: ...TCL Air Conditioner Service Manual 27...
Страница 28: ...TCL Air Conditioner Service Manual 28...
Страница 29: ...TCL Air Conditioner Service Manual 29...
Страница 30: ...TCL Air Conditioner Service Manual 30...