TC Communications TC8116 Скачать руководство пользователя страница 15

- 15 -

TC8116

User's Manual

Rev. 5.6D

Chapter 4 - Bench Tests

General

It is highly recommended to conduct bench tests before actual installation.  Bench testing allows the user
to become familiar with all the functions and features of the TC8116 in a controlled environment.  Knowledge
of these functions and features will ease installation and troubleshooting efforts later on.

Signal Generator Test

After System Start Up, you should conduct the following test to verify that the unit was not damaged during
transportation:

1.

Use a short optic jumper cable to form a loop from optic "TxA" to "RxA."  Once a valid optic signal is
received, the "SYNC," and "RxA" LEDs should light solidly and the Alarm LED should turn off.

2.

Slide SW3 (SIG GEN) to the On (Right or Down) position to turn on each board's Signal Generator.  The
channel "IN" and "OUT" LEDs should light in sequence on all channels.  

Note: the Signal Generator

function does not apply to Dry Contact Relay interfaces.

3.

Disconnect the optic cable from "RxA."  The corresponding channel "OUT" LEDs should be Off while
the "IN" LEDs continue cycling through.

4.

You may connect the optic jumper cable to a second TC8116's optic "RxA" and observe the channel
"OUT" LEDs on the second unit lighting in the same sequence as the first unit's "IN" LEDs.

5.

Upon completion of this test, return SW3 (SIG GEN) to the Off (Up or Right) position.

Local Loopback Test

With SW2 (LOCLB) in the On (Right or Down) position and a valid electrical signal is present at the RJ-
11, the incoming signal on pin 5 (or pins 2 & 5 for balanced signals) will be looped back to pin 4 (or pins 3
& 4 for balanced signals), and the "IN," and "OUT" LEDs will light solidly and the "LOCLB" LED will flash.

The loopback is formed inside the TC8116, after the input signal is converted to the TTL level.  The purpose
of this test is to verify the interface's input and output connections, signal input receiver and signal output
driver.

Remote  Loopback Test

Connect the fiber optic cables from the local TC8116 to the remote TC8116 unit as shown on the diagram
below. Apply a valid electrical signal at any of  the RJ-11 connectors on the rear of the local unit. The "IN"
LED on the local unit should be lit and the "OUT" LED on the remote unit should be lit on the corresponding
channel connected to.

Enable SW1 (RMTLB) to the "On" (Right or Down) position on the remote unit, the optic signal received
at "RxA" or "RxB" will be looped back to the transmitter ("TxA" or "TxB"). Both "IN" and "OUT" LEDs will
be solidly lit on both the local and remote units on the corresponding channel connected to. The "RMTLB"
LED on the remote unit will be flashing.  This test will verify the optic transmitters, receivers and the optical
link between units.

Figure 17.  Remote Loopback Logic Diagram

Tx

Rx

Rx

Tx

Remote Optic

Loopback

ENABLED

when SW1 is On

Local

TC8116

Remote

TC8116

Содержание TC8116

Страница 1: ...any specifica tion TC Communications Inc reserves the right to change or modify the contents of this manual at any time without prior notification TC8116 8 or 16 CHANNEL ASYNC SYNC FIBER OPTIC MULTIPL...

Страница 2: ...onal 9 RJ 11 to DB25 Female Async Connection Cables 10 Transmission Distances typical 12 Launch Power Sensitivity 12 Fiber Optic Redundancy optional 12 Chapter 2 Installation 13 Unpacking the Unit 13...

Страница 3: ...modeloffers several different interchangeable interfaces such as RS 232 RS 422 RS 485 TTL Dry Contact Relay Analog or Intercom It can be upgraded or reconfigured to virtually any configuration simply...

Страница 4: ...trol that are used Not used for future release optic connectors for B board Optional optic signal status for secondary backup optic electrical signal status for channels 9 through 16 DIP switches for...

Страница 5: ...al at RxB has been lost or is degraded Groups 4 9 Optic status indicators Groups 5 8 Electrical signal channel status indicators Each RJ 11 port at the rear panel has two LEDs on the front panel showi...

Страница 6: ...erator This switch SW3 initiates the built in signal generator function The unit will generate a pulse signal to emulate an electrical transmission signal By verifying the Rx channel LEDs on the remot...

Страница 7: ...ins 3 and 4 are balanced output pins Pin 3 is the positive output RxD while pin 4 is negative RxD Either pin 6 or pin 1 can be Signal Ground Only RS 422 RS 485 Async communications can be used with th...

Страница 8: ...pin 5 on an intercom channel is MIC pin 2 is MIC while pin 4 is SPKR and pin 3 is SPKR Figure 7 RJ 11 Analog and Intercom Pin Assignments Virtual Connection Diagrams TC8116 Rear Panel with 2 wire RS...

Страница 9: ...and off status The diagram below illustrates the virtual pin connections for using the TC8116 as either a dry contact Detector Transmitter or a dry contact Closure Receiver The RJ 11 s pins 4 and 5 a...

Страница 10: ...RJ 11 connector pin assignment pin assignment 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 reversed RJ 11 cable Tx Data Rx Data RTS CTS RJ 11 to DB25 female Async DTE to DCE device to TC8116 RJ 11 connector RJ...

Страница 11: ...sync DCE Adapter 1 2 3 4 5 6 2 14 3 16 1 7 RJ 11 Plug RJ 11 Plug P N 650 02206 01 to TC8116 RJ 11 connector to DTE device pin assignment pin assignment 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 reversed RJ...

Страница 12: ...y 34dBm 850nm 1310nm MM 62 5 125 m LASER 36dBm 1310nm Single Mode 9 125 m Launch power sensitivity and distance are listed for reference only These numbers may vary Fiber Optic Redundancy optional Whe...

Страница 13: ...to power up the unit If your system has ten TC8116 cards the power supply requirement is 10 x 400mA 4 0A Either a power adapter or TC Communications power card can be utilized to supply power to the...

Страница 14: ...esults could be erroneous and confusing Calculating the Loss on the Fiber The fiber optic link and or connectors are frequently the source of various problems Check out the connectors and the integrit...

Страница 15: ...urn SW3 SIG GEN to the Off Up or Right position Local Loopback Test With SW2 LOCLB in the On Right or Down position and a valid electrical signal is present at the RJ 11 the incoming signal on pin 5 o...

Страница 16: ...rface RS 232 RS 422 RS 485 TTL Dry Contact Relay Analog or Intercom TTL Input Voltage Maximun Rating 0 5 to 7V Recommended TTL Input Voltage Vin High 2 0V to 5V Vin Low 0V to 0 8V System Bit Error Rat...

Страница 17: ...91 is used for multiplexers and the Model TCRM192 for modems Both can operate with one power supply or dual load sharing power supplies The AC power supply automatically adjusts for 90V to 264V AC inp...

Страница 18: ...irst inspect such goods at the premises of the Buyer or may give written authorization to Buyer to return the goods to TC Communications Inc transportation charges prepaid for examination by TC Commun...

Отзывы: