9
Models 150, 152, 162, 168
Introduction
General Installation Instructions
The following are general installation instructions. For
complete installation details, please see the checkout
card.
Site Preparation
Review the area the unit is to be installed in before
uncrating the unit. Make sure that all possible hazards
the user or equipment may come into have been
addressed.
Clearance: Air Cooled Units
Please see the “Model Specifications” pages for the
minimum clearance requirements of the freezers.
DO NOT
obstruct air intake and discharge openings.
If provided, install the deflector to prevent recirculation
of warm air.
Failure to allow proper clearance and airflow may
cause poor freezer performance and damage to the
machine.
For Indoor Use Only:
This unit is designed to operate
indoors, under normal ambient temperatures of 70
_
-
75
_
F (21
_
- 24
_
C). The freezer has successfully
performed in high ambient temperatures of 104
_
F
(40
_
C) at reduced capacities.
This unit must
NOT
be installed in an area
where a water jet or hose can be used.
NEVER
use a
water jet or hose to rinse or clean this unit. Using a
water jet or hose on or around this equipment may
result in electrocution to the user or damage to the
equipment.
This unit must be installed on a level surface
to avoid the hazard of tipping. Extreme care should be
taken in moving this equipment for any reason.
Two or more people are required to safely move this
unit. Failure to comply may result in personal injury or
equipment damage.
Uncrate the machine. Inspect the unit for damage.
Report any damage to the Taylor factory immediately.
This piece of equipment is made in the USA and has
USA sizes of hardware. All metric conversions are
approximate and vary in size.
Installer Safety
In all areas of the world, equipment should be
installed in accordance with existing local codes.
Please contact your local authorities if you have any
questions.
Care should be taken to ensure that all basic safety
practices are followed during the installation and
servicing activities related to the installation and
service of Taylor equipment.
S
Only authorized Taylor service personnel
should perform installation and repairs on
the equipment.
S
Authorized service personnel should consult
OSHA Standard 29CFRI910.147 or the
applicable code of the local area for the
industry standards on lockout/tagout
procedures before beginning any installation
or repairs.
S
Authorized service personnel must ensure
that the proper PPE is available and worn
when required during installation and
service.
S
Authorized service personnel must remove
all metal jewelry, rings, and watches before
working on electrical equipment.
THIS UNIT HAS MANY SHARP EDGES
THAT CAN CAUSE SEVERE INJURIES.
Examples:
S
scraper blades
S
condenser fins
Содержание Taylormate 150
Страница 2: ......
Страница 18: ...14 Controls and Systems Models 150 152 162 168 130521 Refrigeration Schematic Figure 5 ...
Страница 33: ...29 Models 150 152 162 168 Parts Section 4 Parts S Parts Warranty S Exploded Views S Parts List ...
Страница 35: ...31 Models 150 152 162 168 Parts Notes ...
Страница 36: ...32 Parts Models 150 152 162 168 160210 Model 150 Exploded View Figure 9 ...
Страница 40: ...36 Parts Models 150 152 162 168 160210 Model 152 Exploded View Figure 12 ...
Страница 42: ...38 Parts Models 150 152 162 168 Model 162 Exploded View Figure 13 ...
Страница 46: ...42 Parts Models 150 152 162 168 Model 168 Exploded View Figure 16 ...
Страница 72: ...Model 150 152 050416 12 11 15 Taylor Company 2015 Carrier Commercial Refrigeration Inc c ...
Страница 73: ...Model 150 152 050416 27 11 15 Taylor Company 2015 Carrier Commercial Refrigeration Inc c ...
Страница 74: ...Model 150 152 050416 40 11 15 Taylor Company 2015 Carrier Commercial Refrigeration Inc c ...