6-2
OPERATING PROCEDURES
Model C707
Operating Procedures
6
4.
Install the beater assembly
:
If the blades are in good condition, take one of the
scraper blades and slip it under the hook at the front
of the beater. Wrap the blade around the beater,
following the helix and pushing the blade down onto
the helix as you wrap. At the back end of the beater,
slip the blade under the hook.
Figure 6-3
5.
Repeat this step
for the second scraper blade.
6. Holding the beater securely, slide it into the freezing
cylinder about one-third of the way. Looking into the
freezing cylinder, align the hole at the rear of the
beater with the flats on the end of the driveshaft.
7. Slide the beater the remainder of the way into the
freezing cylinder and over the end of the driveshaft.
The beater should fit snugly but still allow slight
rotation to engage the driveshaft.
Figure 6-4
8. Make sure the beater assembly is in position over the
driveshaft. Turn the beater slightly to be certain that
the beater is properly seated. When in position, the
beater will not protrude beyond the front of the
freezing cylinder.
9. Assemble the freezer door
:
Place the large rubber
gasket into the groove on the back side of the freezer
door.
10. Slide the white plastic front bearing over the baffle
rod onto the bearing hub, making sure that the
flanged end of the bearing is resting against the
freezer door.
Do not lubricate the gasket or the
front bearing.
Figure 6-5
10163
10162
11231
Содержание C707
Страница 16: ...4 4 OPERATOR PARTS IDENTIFICATION Model C707 Operator Parts Identification 4 Notes ...
Страница 36: ...9 2 PARTS REPLACEMENT SCHEDULE Model C707 Parts Replacement Schedule 9 Notes ...
Страница 40: ...10 4 LIMITED WARRANTY ON MACHINES Model C707 Limited Warranty on Machines 10 Notes ...
Страница 44: ...11 4 LIMITED WARRANTY ON PARTS Models C707 Limited Warranty on Parts 11 Notes ...