Taylor 390 Скачать руководство пользователя страница 13

4.8 BEVERAGE EQUIPMENT:   

   

 

 

                            

 

 

4.8.6.3 Iced Cappuccino Machine 

13 

Issue Date: February 21, 2008 

Taylor 390 

 

Last Modified: October 31, 2008 

6.  To assemble the door with the ice buster, install the O-Rings on the draw 

valve and lubricate.  Insert the draw valve into the door spout, leaving 
approximately 1/2” of the valve sticking out the top of the door and ensuring 
that the hole for the handle is positioned on the left side and rotate the draw 
valve so the flats on the top of the draw valve are perpendicular to the door 
face (Diagram A on Page 9).  

     

     

 

7.  Insert the ice buster through the door spout and into the slot located just 

above the lower O-Ring.  With the ice buster in place, rotate the draw valve to 
allow installation of the draw handle. This will lock the ice buster in place.  
With the draw valve handle in place, install the draw valve pin and rotate the 
draw valve handle to allow the draw valve pin to fall into place.  Insert the 
prime plug into the freezer door, but do not tighten fully (needs to be open to 
allow excess air to escape during hopper filling).  

NOTE: Do not lubricate the door gasket or front bearing. 

     

     

 

     

     

 

8.  To install the freezer door, place the front end of the torque rotor into the hole 

in the center of the door.  Position the door onto the four studs on the front of 
the freezing cylinder and push the door into place.  Insert the torque arm 
between the draw valve spout supports and into the hole in the torque 
assembly.  Replace the four stud nuts onto the studs and tighten them equally 
in a criss-cross pattern to insure the door is snug.  

DO NOT 

over-tighten. 

     

     

      

INSERT 

INTO 

HOLE 

All manuals and user guides at all-guides.com

Содержание 390

Страница 1: ...er Iced Cappuccino Parts Tray C Safe Circuit Breaker Lockout Kit O Ring Remover Tool TDL Tune Up Kit 78116 Double Ended TDL Kit 71092 Use on All O Rings All Holes in Metal Parts O Ring Grooves on All...

Страница 2: ...l X52595 6 Screw 011694 7 Base Pan Gasket 050947 8 Base Pan Gasket Insert 051150 9 Spinner X66023 27 10 Drip Tray 046275 11 Wire Splash Shield 046177 12 Drip Pan 035034 13 Side Panel Lower Left 050935...

Страница 3: ...e Clip 046238 3 Prime Plug 050405 14 Scraper Blade 046237 4 O Ring 563 OD x 070W 043758 15 Guide Bearing 014496 5 Draw Handle X47384 16 Door Gasket 014030 6 Draw Valve 047734 17 Front Bearing 013116 7...

Страница 4: ...ing light is located on the front of the machine The indicator light will flash to indicate that the mix hopper is empty and the mix supply needs to be replenished To prevent damage to the unit refrig...

Страница 5: ...TRAY Place parts in the assigned area when cleaning the machine Beater Shaft Torque Assembly Beater Shaft O Ring Draw Valve Draw Valve O Rings 2 Valve Handle Pin Draw Valve Handle Freezer Door Door Ga...

Страница 6: ...tized Salmon cloth and a solution of Sanitizer to clean the spinners 3 Switch the unit back to the FREEZE position when cleaning is complete to ensure that the product in the freezing cylinder does no...

Страница 7: ...allow the frozen product to soften 2 Remove the hopper cover Take to the sink for cleaning 3 Place a pail under the door spout and move the draw handle to the right When all product stops flowing from...

Страница 8: ...se water being drawn from the freezing cylinder is clear Disassembly NOTE BE SURE THE CONTROL SWITCH IS IN THE OFF POSITION Failure to do so may cause injury from electrocution or hazardous moving par...

Страница 9: ...sing a dry Salmon cloth or paper towel apply pressure in an upward direction until the O Ring pops out of its groove With the other hand push the top of the O Ring forward and it will roll out of the...

Страница 10: ...Place your hand into the back of the freezing cylinder grasp the beater shaft and pull straight out towards you to remove Remove the beater shaft seal and O Ring from the beater shaft Use a Salmon cl...

Страница 11: ...1 To reassemble the beater drive shaft slide the beater shaft seal onto the beater shaft until it snaps into place and then slide the O Ring into the first groove Lubricate the groove O Ring and beate...

Страница 12: ...freezing cylinder and slide into position over the drive shaft Turn the beater slightly to be certain that the beater is properly seated When in position the beater will not protrude beyond the front...

Страница 13: ...the draw handle This will lock the ice buster in place With the draw valve handle in place install the draw valve pin and rotate the draw valve handle to allow the draw valve pin to fall into place In...

Страница 14: ...closed While the solution is flowing into the freezing cylinder brush clean the mix hopper mix inlet hole and mix level sensing probes 14 Place the control switch in the WASH position This will cause...

Страница 15: ...he draw handle to the right Dispense approximately 2 oz of the mix to force out any remaining sanitizing solution and then move the draw handle to the left Discard the dispensed waste Iced Cappuccino...

Страница 16: ...ft Boot Seal 1 x Tool O Ring Removal 1 x Scraper Blade 2 x O Ring 563 OD x 070W 1 x Lubricant 1 x NOTE In order to maximize performance and efficiency of the unit all parts should be replaced three ti...

Отзывы: