MB2000/3000/5000 OPERATING AND MAINTENANCE MANUAL
TAYLOR-WHARTON (BEIJING) CRYOGENIC EQUIPMENT CO., LTD.
19
a. vacuum probe,
b. vacuum probe isolation valve,
c. vacuum pumpout valve,
d. Sealed insulation ports (on top of the tank),
e. vacuum pump down connection and vacuum bursting disc.
f. All liquid and gas phase lines exit points through vacuum jacket.
g. Any area of the vacuum jacket that might have been exposed to cryogenic liquid spray or
temperatures.
Look for signs of damage, corrosion, or damaged valves, and other abnormal conditions. Contact the
factory for repair and re-evacuation procedures
。
MOVE TANK
This tank must be shipped and lifted empty, and with a warm inner vessel
。