
Norris boardroom table – 2 Surfaces
Figure 6
Figure 7
Tools & Hardware Needed
9.
Set the power grommets into the
hole of the table top and lay the
electrical wires and
communication cables in the
bridge and end gables, (Figure 6).
10.
Please refer to pages 8-9.
Follow
Steps 7 to 12
to install the gable
and bridge covers.
11.
Insert the plinth gable cover by
angling it at 30 degrees; place the
hooks into the slots and release it
down gently, (Figure 7).
Repeat this to install the other
plinth gable cover.
FEBRUARY 2020
norris 13
Содержание Norris Boardroom Table 1 Surface
Страница 1: ...Norris installation guide February 2020...
Страница 18: ......
Страница 19: ......
Страница 20: ...tayco com 0220...