Norris boardroom table – 1 Surface
Figure 6
Figure 7
Tools & Hardware Needed
8540-1279
8485-0274
8540-0789_SCREW
8540-0587
Drill
Robertson # 2
‘V’ Knuckle Strike
(4X)
Z- Bracket (4X)
#10 X 11/16" Pan
Head Screw (8X)
#6 X 5/8" Pan Head
Screw (8X)
7.
Pull the ‘V’ knuckle strikes from
the ‘V’ knuckle catch of the
steel gables, (Figure 6).
8.
Securely fasten the ‘V’ knuckle
strikes to outer gable cover,
using #6 X 5/8” Pan Head
Screws into the pre-drilled
holes, (Figure 7).
9.
Securely fasten the Z-brackets
to outer gable cover, using #10
X 11/16” Oval Head Screws into
the pre-drilled holes, (Figure 7).
10.
Follow
Steps 8 to 9
to install
the hardware of the inner gable
covers.
Continued on the next page >>
FEBRUARY 2020
norris 8
Содержание Norris Boardroom Table 1 Surface
Страница 1: ...Norris installation guide February 2020...
Страница 18: ......
Страница 19: ......
Страница 20: ...tayco com 0220...