32
pulley catch plate
20*96*T3
4
33
guide rod
Φ25*1850
2
34
guide rod lock sleeve
2
35
safety hook left
1
36
safety hook right
1
37
bearing frame
2
39
screw
M8*10
2
41
gasket
Φ12
2
42
spring gasket
Φ12
2
43
allen bolt
M12*40
2
44
rubber cushion
Φ60*Φ58*Φ26*25
4
45
weight plate
6 kg
30
46
top weight plate
2
47
rubber cushion
Φ60*Φ26*42
4
48
guide rod
Φ25*1660
4
49
selector rod
2
50
hexagon bolt
M10*85
6
51
weight pin
2
52
cable
Φ5*7920mm
2
54
pulley
Φ95
12
55
pulley
Φ60
2
56
hexagon bolt
M10*45
8
58
shield
2
59
barbell plate holder
4
60
hook
6
62
T shape pin
Φ10*85
10
63
core trainer
1
64
lat pull down roller
1
65
J hook right
1
66
J hook left
1
67
barbell rod storage
1
68
spotting arm left
1
69
spotting arm right
1
70
T shape pin
Φ10*100
1
50
Universal Smith Machine
Содержание Universal Smith Machine
Страница 2: ...2 Universal Smith Machine...
Страница 4: ...4 Universal Smith Machine...
Страница 21: ...21...
Страница 23: ...Assembly step 2 25 23 11 14 24 22 21 9 84 14 26 9 12 14 10 11 10 14 14 11 14 11 10 14 23...
Страница 25: ...Assembly step 3 28 29 27 34 37 41 42 36 44 33 35 43 37 44 39 25...
Страница 31: ...31 Once the cable tension is correctly adjusted make sure to tighten the pulley in the pulley bracket 100 or 88...
Страница 33: ...33...
Страница 35: ...Assembly step 6 85 86 16 60 60 17 14 17 14 14 86 17 bly step 6 85 86 16 17 14 17 14 14 86 17 35 Fig B...
Страница 37: ...63 10 69 73 64 65 68 67 11 12 14 71 70 66 73 72 99 37...
Страница 41: ...41...
Страница 57: ...57 Notes...
Страница 58: ...58 Universal Smith Machine Notes...
Страница 59: ...59...
Страница 60: ...Universal Smith Machine...