34
Universal Smith Machine
Step 10:
Assembly of the Shields, Part 2
1. Attach six hooks (60) to the back link tubes (5) with one washer (17) and one nut (16) each.
Tighten the nuts and cap with one plastic cover (14) each.
L
NOTICE
The board (85) must be attached from the inside. Please refer to figure B for a more detailed
overview and order of the components.
2. First attach the board (85) loosely to the rear struts of the left and right frames (3 & 2) with a total
of four bolts (86) and four washers (17). Then tighten und cap each bolt connection with one
plastic cover (14).
Содержание Universal Smith Machine
Страница 2: ...2 Universal Smith Machine...
Страница 4: ...4 Universal Smith Machine...
Страница 21: ...21...
Страница 23: ...Assembly step 2 25 23 11 14 24 22 21 9 84 14 26 9 12 14 10 11 10 14 14 11 14 11 10 14 23...
Страница 25: ...Assembly step 3 28 29 27 34 37 41 42 36 44 33 35 43 37 44 39 25...
Страница 31: ...31 Once the cable tension is correctly adjusted make sure to tighten the pulley in the pulley bracket 100 or 88...
Страница 33: ...33...
Страница 35: ...Assembly step 6 85 86 16 60 60 17 14 17 14 14 86 17 bly step 6 85 86 16 17 14 17 14 14 86 17 35 Fig B...
Страница 37: ...63 10 69 73 64 65 68 67 11 12 14 71 70 66 73 72 99 37...
Страница 41: ...41...
Страница 57: ...57 Notes...
Страница 58: ...58 Universal Smith Machine Notes...
Страница 59: ...59...
Страница 60: ...Universal Smith Machine...