Assembly step 1
7
3
8
17
15
16
1
6
12
14
11
11
10 14
14
2
20
Universal Smith Machine
Step 3:
Assembly of the Main Frame, Part 3
1. Attach the front link tube (8) to the left and right frame (3 & 2) with two bolts (12), one big
reinforcing plate (6), four washers (11), two nuts (10) and four plastic covers (14) on each frame.
2. Attach the hanging ring (15) to the front link tube (8) with two washers (17), two nuts (16) and
two plastic covers (14).
3. Now tighten all bolts and nuts from the assembly steps 1, 2 and 3 and cap each connection with
one plastic cover (14) like shown in the drawings.
Содержание Universal Smith Machine
Страница 2: ...2 Universal Smith Machine...
Страница 4: ...4 Universal Smith Machine...
Страница 21: ...21...
Страница 23: ...Assembly step 2 25 23 11 14 24 22 21 9 84 14 26 9 12 14 10 11 10 14 14 11 14 11 10 14 23...
Страница 25: ...Assembly step 3 28 29 27 34 37 41 42 36 44 33 35 43 37 44 39 25...
Страница 31: ...31 Once the cable tension is correctly adjusted make sure to tighten the pulley in the pulley bracket 100 or 88...
Страница 33: ...33...
Страница 35: ...Assembly step 6 85 86 16 60 60 17 14 17 14 14 86 17 bly step 6 85 86 16 17 14 17 14 14 86 17 35 Fig B...
Страница 37: ...63 10 69 73 64 65 68 67 11 12 14 71 70 66 73 72 99 37...
Страница 41: ...41...
Страница 57: ...57 Notes...
Страница 58: ...58 Universal Smith Machine Notes...
Страница 59: ...59...
Страница 60: ...Universal Smith Machine...