13
STEP 4
– Trampoline Mat Assembly
A. Lay out the Trampoline Mat (# 1) inside the frame with warning labels facing up as shown in FIGURE 6
.
There are total of 72 Triangle-Rings sewn on the mat and 72 holes on the Top Rail Frame. None are
numbered, so please follow the instructions carefully to ensure proper installation.
SPRING LOADING INSTRUCTION
CAUTION
Two adults are required in this assembling step.
CAREFUL - When attaching the springs, please do not put your hands, legs, or body close to the
connector points. The connector points can become pinch points since the trampoline is tightening up.
Wear heavy duty working gloves to protect your hand.
Use the special spring loading tool included.
SPRING LOADING TOOL (# 9)
FIGURE 6
ZERO
FRAME
TRIANGLE-RING
TRAMPOLINE MAT
(# 1)