TRAMPOLINE MAT ASSEMBLY
19
Step 9
– Spring Assembly
Continue to attach springs in the same manner. For even distribution of tension and ease of assembly,
the springs must be placed on opposite sides of the mat in an alternating manner, i.e. 5 then 32, 11 then
39, 18 then 46, 25 then 53, etc. In addition to the previously installed springs, you should now have
springs at 5, 11, 18, 25, 32, 39, 46 and 53 as shown below.