TRAMPOLINE MAT ASSEMBLY
12
Step 2
– Leg Support and Top Rail with Leg Socket Assembly
At this point, two people will be needed to assemble the trampoline.
Connect the Vertical Leg Extensions (# 6A and # 6B) to the Leg Base (# 5) as shown below (the assembled
parts will be hereinafter referred
to as “Leg Support”).
Note:
Vertical Leg Extension (# 6B) has two (2) holes.
Lift two sets of the assembled Leg Supports to a vertical (standing) position. Connect one end of Top Rail
with Leg Socket (# 3) to Vertical Leg Extension (# 6A) and the other side to Vertical Leg Extension with 2
holes (# 6B) as shown below. Repeat in the same manner to assemble all Leg Supports.
Hint:
Make sure the larger indented hole
on Vertical Leg Extension (# 6B) is facing outward. This is
important for installing the enclosure later.
Leg Support
LARGER INDENTED
HOLES MUST
FACE OUTWARD
DO NOT PLACE HANDS NEAR
THE OPENING WHEN
CONNECTING THE TUBES
.
WEAR PROTECTIVE GLOVES
TO PROTECT FROM INJURIES
DURING ASSEMBLY.