background image

©Copyright Task Force Tips LLC 2008-2021

20

LIY-300 May 28, 2021 Rev19

TASK FORCE TIPS LLC

MADE IN USA · tft.com 

3701 Innovation Way, Valparaiso, IN 46383-9327 USA

800-348-2686 · 219-462-6161 · Fax 219-464-7155

10.0 OPERATION AND INSPECTION CHECKLIST

BEFORE EACH USE,

 appliances must be inspected to this checklist:

1. All valves (if so equipped) open and close fully and smoothly

2. Waterway is clear of obstructions

3. There is no damage to any thread or other connection

4. All locks and hold-down devices work properly

5. The pressure setting on the relief valve (if so equipped) is set correctly

6. Gaskets are in good repair

7. There is no obvious damage such as missing, broken or loose parts

8. There is no damage to the appliance that could impair safe operation (e.g. dents, cracks, corrosion, or other defects)

9. All swiveling elements rotate freely

10. Nozzle is securely attached 

BEFORE BEING PLACED BACK IN SERVICE,

 appliances must be inspected to this checklist:

1. All valves (if so equipped) open and close smoothly and fully

2. The waterway is clear of obstructions

3. There is no damage to any thread or other type connection

4. The pressure setting of the relief valve, if any, is set correctly

5. All locks and hold-down devices work properly

6. Internal gaskets are in accordance with NFPA 1962

7. There is no damage to the appliance that could impair safe operation (e.g. dents, cracks, corrosion, or other defects)

8. All swiveling connections rotate freely

9. There are no missing parts or components

10. The marking for maximum operating pressure is visible

11. There are no missing, broken, or worn lugs on couplings

NFPA  1962:  Standard  for  the  care, use, inspection,  service  testing,  and  replacement of fire  hose,  couplings,  nozzles  and  fire hose appliances.  Quincy, MA:  National Fire

Protection Agency 

WARNING

Equipment failing any part of the checklist is unsafe for use and must have the problem corrected 

before use or being placed back into service. Operating equipment that has failed the checklist is a 

misuse of this equipment. 

Содержание TORNADO

Страница 1: ...use of this equipment Obtain safety information at tft com serial number This equipment is intended for use by trained and qualified emergency services personnel for firefighting All personnel using t...

Страница 2: ...ctuator SECTION 4 17 Valve Kits YE VK PH SECTION 5 0 Troubleshooting SECTION 4 14 Multiplex Interface Control YE CAN SECTION 4 15 Ethernet Interface Control SECTION 4 9 Toggle Switch Monitor Operator...

Страница 3: ...TRUCTIONS 5 1 MANUAL TILLER MODEL SPRAY TRAJECTORY ADJUSTMENT 5 2 OPERATION OF OSCILLATING MONITORS 5 2 1 HORIZONTAL ROTATION CONTROL 5 2 2 ELEVATION CONTROL 5 2 3 TO ENGAGE THE OSCILLATING MECHANISM...

Страница 4: ...ry or damage can occur from an inadequately supported monitor The mounting must be capable of supporting the nozzle reaction force which can be as high as 1500 lbs WARNING The stream exiting a nozzle...

Страница 5: ...mental Instructions LIY 500 MANUAL ELECTRIC OSC US METRIC US METRIC US METRIC Weight 12 lbs 5 5 kg 25 lbs 11 4 kg 27 lbs 12 2 kg Minimum Flow Area 8 3 in2 24 5 cm2 8 3 in2 24 5 cm2 8 3 in2 24 5 cm2 Ma...

Страница 6: ...operate the monitor outside the envelope in the following graph s Tornado Operating Envelope Flow gpm Monitor Inlet Pressure psi Flow lpm Monitor Inlet Pressure bar 0 25 50 75 100 125 150 175 200 225...

Страница 7: ...hat uses a tiller bar to control horizontal rotation Electric remote control models are available in a standard model suitable for on top of pumpers a Ladder model and a Platform model The Ladder or P...

Страница 8: ...NH MALE Y2325ANF 2 5 BSP MALE Y2320ABJ TORNADO RC MODEL TORNADO TILLER BAR MODEL INLET COUPLING 2 5 7 5 NH 2 5 BSP FEMALE Y2405A 2 0 BSP FEMALE Y2425A 2 5 ANSI 150 Y2430A 3 0 ANSI 150 Y2431 2 5 NPT FE...

Страница 9: ...EMALE 1 50 38 mm Y2 6 A 2 5 ANSI 150 FLANGE 2 00 51 mm Y2 0 A 3 0 ANSI 150 FLANGE 2 10 53 mm Y2 7 A 2 5 8 NPT FEMALE 2 00 51 mm Y2 8 A 2 0 11 5 NPT FEMALE 1 50 38 mm Y2 9 A 3 0 8 NPT FEMALE 2 44 62 mm...

Страница 10: ...2 5 ANSI 150 FLANGE 0 60 15 mm Y2 SF A 3 0 ANSI 150 FLANGE 0 00 0 mm Y2 SG A 4 0 ANSI 150 FLANGE DN100 PN16 0 16 4 mm 90 45 185 LEFT 185 RIGHT 158mm 6 20 153mm 6 00 425mm 16 70 315mm 12 40 Figure 3 7D...

Страница 11: ...RNING Reaction forces generated by master stream flows are capable of causing injury and property damage if not properly supported Monitors should be securely installed by qualified individuals Mounti...

Страница 12: ...pling up and release the pin before installing monitor on the adapter Once the monitor is properly aligned on the adapter hold the pin out while sliding the coupling down to the adapter Rotate the cou...

Страница 13: ...connections may cause equipment to leak or uncouple under pressure Failure could result in injury Equipment must be mated to matched connections CAUTION Dissimilar metals coupled together can cause g...

Страница 14: ...in contact with an object The safety device will allow the mechanism to continue to oscillate the portion of its sweep path not blocked by the obstruction The safety mechanism also allows the oscillat...

Страница 15: ...h oscillation subtract 20 from the distance Figure 5 2 CAUTION Because the nozzle attached to the oscillator must slow down stop and reverse direction at the end of each sweep the ends of the covered...

Страница 16: ...S In the event of electrical system failure on the monitor or fire truck the Tornado RC monitor may be manually operated with factory supplied override knobs To make the Tornado RC more compact the ma...

Страница 17: ...0 PSI 1 25 INCH TIP HORIZONTAL DISTANCE M HORIZONTAL DISTANCE FEET VERTICAL DISTANCE FEET VERTICAL DISTANCE M 0 10 20 30 40 50 60 0 5 10 15 0 20 40 60 0 20 40 60 80 100 120 140 160 180 200 220 40 PSI...

Страница 18: ...ime If the equipment is covered by this limited warranty TFT will assume the expenses of repair If any defect attributable to TFT under this limited warranty cannot be reasonably cured by repair or re...

Страница 19: ...service is available with repair time seldom exceeding one day in our facility Factory serviced equipment is repaired by experienced technicians wet tested to original specifications and promptly ret...

Страница 20: ...appliances must be inspected to this checklist 1 All valves if so equipped open and close smoothly and fully 2 The waterway is clear of obstructions 3 There is no damage to any thread or other type co...

Отзывы: