background image

MAINTENANCE 

Issue : 020913-B 

TPUK-GU31X 

   

37 

 

Routine inspection 

 
Routinely check the function and set up, as normal wear can affect 
performance. To check set up; follow the instructions in the application 
specific sections of this manual. 
 
The unit maintenance free.  

   

Complete inspection 

 
 

 

 
Before dismantling the Guardian be sure to 
 

 

Drain all liquid from the system. 

 

Cleanse or neutralize the Guardian thoroughly. 

 

Disconnect the air supply 

 

 

 
Dismantling procedure (See Fig. SP-01) 
 
1.

 

Undo tie rods and remove air-side assembly from the fluid-
side of the Guardian. 

2.

 

Inspect the diaphragm surface for damage. 

 
If the diaphragm is undamaged reassemble the guardian and 
perform the set up procedure detailed in this manual. 
 
If the diaphragm is damaged there is a possibility the media 
has penetrated the internals of the guardian air side, causing 
damage to the seals, etc’. 

DO NOT RETURN TO SERVICE.

 

Please consult Tapflo (UK) regarding replacement parts. 
 

 

 
Assembling the Guardian 
 
1.

 

Replace the air side with the fluid side. 

2.

 

Equally tighten the tie-rods Fig.MA-01 (11) to the torque 

detailed in the table below. 

 

Tightening torques 

Aluminium 

316L 

PTFE (conductive) 

3.8Nm 

   

Содержание Guardian system Mk3.1

Страница 1: ...TPUK GU31X _T Operation Maintenance Manual Guardian system Mk3 1 Instructions for the installation start up operation maintenance and repair Spare parts STOP Read this instruction manual carefully be...

Страница 2: ...oint adjustment Operation Trouble shooting 17 Dry run Stop DR S Principle of operation Recommended installation Set point adjustment Operation Trouble shooting 23 Dead head Stop DH S Principle of oper...

Страница 3: ...s group II Protection method Constructional safety Maximum surface temperature 135O C Marking Standards Directives EN13463 1 EN13463 5 The Machinery Directive 2006 42 EC Non Annex IV Machinery Self de...

Страница 4: ...w and the prevention of damage to or destruction of the system or its associate equipment This symbol signals possible danger caused by the presence of electric fields or live wires Receiving inspecti...

Страница 5: ...amage and may cause injury to personnel Health and Safety Systems must be installed according to local and national safety rules The system must be suitable for the application Failure to do so could...

Страница 6: ...ures Fully pneumatic Floating PTFE diaphragm 316L stainless steel PTFE conductive or Aluminum wetted parts Pilot output to control the associate pump Integral reset button Integral visual indicator Pn...

Страница 7: ...ction plate as shown if Fig GEN 01 in conjunction with the associate table below To reconfigure undo the 4x retaining screws and rotate the plate to the correct orientation and refit being careful to...

Страница 8: ...uardian must be adjusted to the correct set point to ensure proper operation Follow the instructions detailed in the application specific sections of this manual Fig GEN 02 1 Guardian Mk 3 1 2 Set poi...

Страница 9: ...ush fit connection into the Reset I P connection Connect a 3 2 NC valve to the reset I P connection Valve could be manual or solenoid operated and only need be a small orifice M5 size valve The reset...

Страница 10: ...facility see Fig GEN 04 Remove the M5 plug and install a 4mm to M5 push fit connection into the Alarm O P connection Fig GEN 04 2 Connect any of the output options as shown in Fig GEN 04 4 5 6 or 7 T...

Страница 11: ...BARRIER STOP BARR Issue 020913 B TPUK GU31X 9 BARRIER STOP BARR...

Страница 12: ...pically no additional system is used to determine if a breach has occurred and the fault goes unnoticed contaminating the media with incompatible materials and eventually the back up diaphragms breach...

Страница 13: ...page 6 Media connection is connected to the barrier void ports The void ports should be linked as shown in Fig BARR 02 4 P2 Air supply is connected to a filtered and regulated compressed air source of...

Страница 14: ...n be started and stopped normally by turning the supply to the Guardian on off however if not or it stops the pump erratically increase the set point regulator clockwise in half turn increments until...

Страница 15: ...int is simply adjusted to a specific pressure using an external pressure gauge connected to the set point o p connection 1 Remove the M5 plug and connect an external pressure gauge to the set point O...

Страница 16: ...aintained before being returned to service Refer to the Maintenance section of this manual for procedures to safely maintain the Guardian Please refer to the pump manual for details on how to safely m...

Страница 17: ...lator Pump stops erratically Media has changed Perform recalibration Leaking interconnections Remake or replace interconnections Guardian set for alternative application Check function plate position...

Страница 18: ...BARRIER STOP BARR Issue 020913 B TPUK GU31X 16...

Страница 19: ...DRY RUN STOP DR S Issue 020913 B TPUK GU31X 17 DRY RUN STOP DR S...

Страница 20: ...luid discharge pressure of the pump changing it s output if the monitored pressure falls below the set point of the Guardian representing a loss of media in the pump suction line stopping the associat...

Страница 21: ...gulated compressed air source Valve O P pilots an external pilot valve sized appropriately for the pumps air inlet such as a Tapflo TPUK BV Alarm O P can be connected to a variety of indicators or plu...

Страница 22: ...uardian anti clockwise until it turns freely 5 Turn on the air supply 6 Slowly increase the set point regulator adjustment screw Fig GEN 01 2 clockwise until the pressure gauge indicates desired press...

Страница 23: ...ect Perform recalibration Air supply is not stable Fit air pressure regulator Media has changed Perform set up procedure Pump stops erratically Leaking interconnections Remake or replace interconnecti...

Страница 24: ...DRY RUN STOP DR S Issue 020913 B TPUK GU31X 22...

Страница 25: ...DEAD HEAD STOP DH S Issue 020913 B TPUK GU31X 23 DEAD HEAD STOP DH S...

Страница 26: ...scharge pressure of the pump changing it s output if the monitored pressure exceeds the set point of the Guardian representing a closed valve or over pressure in the pump discharge line stopping the a...

Страница 27: ...nd regulated compressed air source Valve O P pilots an external pilot valve sized appropriately for the pumps air inlet such as a Tapflo TPUK BV Alarm O P can be connected to a variety of indicators o...

Страница 28: ...a further half turn 7 The Reset button should remain in the in position and the pump can be started and stopped normally by turning the supply to the Guardian on off however if not or it stops the pum...

Страница 29: ...system is ready for use Calculated This method of set up is used when the set point pressure is known The Guardian s set point is simply adjusted to a specific pressure using an external pressure gaug...

Страница 30: ...tom Cause Remedy Pump failure See pump operating manual Unstable air supply Check all connections and air supply System is inoperative Inconsistent pump discharge pressure Fit back pressure device suc...

Страница 31: ...DEAD HEAD RESTART DH R Issue 020913 B TPUK GU31X 29 DEAD HEAD RESTART DH R...

Страница 32: ...changing it s output if the monitored pressure rises to the set point of the Guardian representing a closed valve or over pressure in the pump discharge line stopping the associate pump and automatica...

Страница 33: ...o the discharge pipe work of the pump Air in is connected to a filtered and regulated compressed air source Valve O P is plugged DH R O P pilots an external pilot valve sized appropriately for the pum...

Страница 34: ...be started and stopped normally by turning the supply to the Guardian on off however if not or it stops the pump erratically increase the set point regulator clockwise in half turn increments until th...

Страница 35: ...s known The Guardian s set point is simply adjusted to a specific pressure using an external pressure gauge connected to the set point O P connection 1 Remove the M5 plug and connect an external press...

Страница 36: ...orrect Perform recalibration Air supply is not stable Fit air pressure regulator Media has changed Perform set up procedure Pump stops erratically Leaking interconnections Remake or replace interconne...

Страница 37: ...32mm DD 72mm DW 71mm DB 24mm slot 5x10 ATEX A Earth point Fig SP 01 Connections Port No Description Connection type 12 Reset I P M5 2 Valve O P 4mm push fit 1 Air in 4mm push fit 4 Alarm O P M5 Suppli...

Страница 38: ...sure Absolute Maximum pressure 12 BAR 25 BAR 8 BAR Weight 1100g 1400g 1100g Note Air in must be 1 bar greater than the set point Guardian coding The code details the specifications function and materi...

Страница 39: ...do tie rods and remove air side assembly from the fluid side of the Guardian 2 Inspect the diaphragm surface for damage If the diaphragm is undamaged reassemble the guardian and perform the set up pro...

Страница 40: ...push fit connector 3 PF 4 M5 STUD 9 Set point regulator cover 1 G SPCOVER X 10 Set point regulator screw 1 TPUK 00305 X 4 F SOCCAP M4X30 A2 70 4 F NUT M4 NYLOCK A2 11 Tie rods nuts washers 8 F WASHER...

Страница 41: ...r and wear shall not be covered by the warranty Tapflo shall decide as to whether the defective or faulty part shall be replaced or repaired 5 The warrantee of the products shall be valid for a period...

Страница 42: ...Contact Name Telephone Fax E mail Delivery date Install date System Type Serial No Description of fault Media Temperature O C Viscosity cPs Spec grav Kg m3 pH Value Particle content Particle size mm...

Страница 43: ...WARRANTY Issue 020913 B TPUK GU31X 41 Warranty return form Sketch of installation...

Страница 44: ...ensure that all the information contained in this document is correct at the time of publication due to our policy of continuous product improvement the company reserves its right to change any inform...

Отзывы: