TANGRA HP 30 Скачать руководство пользователя страница 20

 

User manual  TANGRA HP30 - Rev. 04 - 2014-03-28      

 

 

   

20 

9. Maintenance 

9.1  Cleaning of the combustion chamber 

Accumulation  of  ash  depends  mainly  of  the  quality  of  the  pellets  and  operation  hours  of  the 
boiler. The boiler is supplied with tray and blades to collect the ashes. We recommend once a 
week  to  check  the  amount  of  ash,  collected  at  the  bottom  of  the  combustion  chamber  and  if 
necessary to clean it. 

9.2  Annual maintenance 

This should be done once a year or after 5 tones of pellets are burned. The annual maintenance 
should  be  done  by  authorized  organization.  This  includes  testing  of  the  systems  and  general 
cleaning of the burner, combustion chamber, pipes and upper flue gas chamber. 

Annual maintenance is a compulsory part in connection with warranty service

In case of rejection, incorrect work, alarm messages on the display you should contact your 
service provider and follow his instruction.   

You can also receive additional help and instructions from the manufacturer using the contacts 
mentioned on the last page. 

10. 

Decommissioning 

When decommissioning a unit, the following activities are to be carried out: 

  When dismantling a unit, all components, which are under voltage, must be switched off. 

The unit must be fully disconnected from the electrical network. 

  The water tank must be drained. Blown the coils with pressure air to secure that no fluid 

is left, otherwise the water can freeze, when the temperature is low. 

  Follow the instruction when transport, lifting, loading and uploading the unit.  

  If you can handle this alone, please, contact the manufacturer 

 

10.1  Dismantling and disposal 

After  the  “lifetime”  of  the  unit  is  run  out,  it  must  be  professionally  dismantled.    Prior  to 
dismantling, it must be ensured that all energy lines (electrical and all media) are switched off. 
No lines should remain supplied with voltage, temperature or other energy. All components are 
to be disposed or recycled in accordance to national regulations. 

11. 

Emergency activities 

In case of rejection, incorrect work, alarm messages on the display you should contact your 
service provider and follow his instruction.   

You can also receive additional help and instructions from the manufacturer using the contacts 
mentioned on the last page. 

Содержание HP 30

Страница 1: ...Manufactured in accordance with standard EN 303 5 Rev 04 2014 03 28 Installation and operation manual for pellet boiler TANGRA HP 30...

Страница 2: ...User manual TANGRA HP30 Rev 04 2014 03 28 2...

Страница 3: ...irements to the pellets 17 8 Commissioning 17 8 1 Filling the installation 17 8 2 Initial filling of the auger 17 8 3 Set the capacity of the boiler 18 8 4 Set the temperature in the boiler 19 8 5 Ini...

Страница 4: ...User manual TANGRA HP30 Rev 04 2014 03 28 4...

Страница 5: ...User manual TANGRA HP30 Rev 04 2014 03 28 5...

Страница 6: ...g or cleaning the unit all safety rules should be strictly observed The use of personal protective equipment is required Changes in the construction of the unit and all its components without consulti...

Страница 7: ...with hot parts of the boiler or chimney could lead to seriouse burns and injuries Mandatory use of protective gloves Do not open the burning chamber s door during operation This could lead to injurie...

Страница 8: ...Turn on off the boiler from the main supply to the boiler is done with the key that is located on the right of the control panel This key is single pola and provides on off only of the phase conducto...

Страница 9: ...tion operation and maintenance Repairs from the buyer himself or an unauthorized maintenance company Changes in the construction of the unit Units which capacity is not correctly selected Damages caus...

Страница 10: ...UM DRAUGHT IN THE CHIMNEY Pa 20 OVERALL DIMENSIONS OF PELLET BOILER B L H mm 710 890 1600 OVERALL DIMENSIONS OF PELLET STORAGE TANK B L H mm 710 890 1600 TOTAL WEIGHT kg 320 MAXIMAL PRESSURE OF WATER...

Страница 11: ...ts of the boiler TANGRA HP 30 fig 1 N Name 1 Connection to the chimney system 2 Connections to the heating system 3 Controller 4 Auger for automatic supply of the burner with fuel 5 Pellet storage tan...

Страница 12: ...d prior to transport All unit components should be inspected for transport damages immediately upon delivery with annotations made on the delivery slip as appropriate Damages caused during transport w...

Страница 13: ...ct operation of the boiler Room temperature from 5 C to 40 C Relative humidity up to 90 at 20 C decreasing to 50 at 40 C Degree of environmental pollution 2 It is forbidden to install the boiler in li...

Страница 14: ...fan coil units closed or opened type Mixing unit should be installed in order to decrease the temperature of the water after the boiler It is totally forbidden to install stop and control valves betwe...

Страница 15: ...he boiler body and is leveled in a way similar to the boiler body Both units shall be leveled one to another and to fit fig 6 Both parts are connected with 6 bolts M8 two based in the main plate and 4...

Страница 16: ...th connector which supply the compressor and the auger according to fig 5 Burner bottom view 5 It is forbidden to install the boiler in the technical room on the transport pallet The pallet must be re...

Страница 17: ...of pellets 8 Commissioning 8 1 Filling the installation Filling the installation filling with fuel and check the integrity of the unit After the installation of the boiler and its connection to the h...

Страница 18: ...exible connection for pellets to the burner If you want to change the capacity in Auto mode highest capacity enter in menu Setup level Parameters change parameter 18 in proportion with what we want to...

Страница 19: ...means that the boiler is in ignition mode When appeared a stable flame 3 10min the boiler turn into working mode and the lamp light up permanently The boiler works at maximum capacity until it reaches...

Страница 20: ...last page 10 Decommissioning When decommissioning a unit the following activities are to be carried out When dismantling a unit all components which are under voltage must be switched off The unit mu...

Страница 21: ...please contact the your installer or the manufacturer find contacts on the last page 11 2 Smell of flue gases Flue gases could cause fatal poisoning In case you smell a flue gases Turn off the power s...

Страница 22: ...User manual TANGRA HP30 Rev 04 2014 03 28 22 12 Appendix 12 1 Wiring diagram...

Страница 23: ...can affect the operation of the unit and it is not recommended by the manufacturer Switching on off the boiler is done by holding the On OFF button This button ensures functional start up of the boile...

Страница 24: ...to the Table on next page for descriptions of the buttons It is possible to activate keyboard sound signal The following sound alarms are available Short high tone sounds when navigating the menu and...

Страница 25: ...User manual TANGRA HP30 Rev 04 2014 03 28 25 13 2 Schemes of the main menu...

Страница 26: ...User manual TANGRA HP30 Rev 04 2014 03 28 26 13 3 Description of the functions...

Страница 27: ...User manual TANGRA HP30 Rev 04 2014 03 28 27...

Страница 28: ...4 03 28 28 13 4 Service menu of the boiler Possible errors 001 Keyboard error E004 Motherboard communication error E108 security switch error E110 NTC1 error temperature sensor E111 TC1 error temperat...

Страница 29: ...rent by reaching of which the controller starts fire up Example if 1 65 and parameter 50 10 the boiler will restart at 1 55 o C 5 20 5 51 Tgiven required water temperature in the boiler When Tgiven is...

Страница 30: ...and blow cleaning started s 0 120 30 82 Minimal air quantity entering at the burner under which alarm is activated stuffed chimney fan failure etc 1 100 20 83 Time delay before triggering pressure er...

Страница 31: ...User manual TANGRA HP30 Rev 04 2014 03 28 31...

Страница 32: ...User manual TANGRA HP30 Rev 04 2014 03 28 32...

Отзывы: