![TANGRA HP 30 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/tangra/hp-30/hp-30_installation-and-operation-manual_3490794017.webp)
User manual TANGRA HP30 - Rev. 04 - 2014-03-28
17
6.6 Electrical power supply
Main wire for electrical power supply - 3
х
1,5m
2
,double insulated.
7. Requirements to the pellets
„CL 35” is designed to work with wood pellets, with diameter 6-8mm, length 5-30mm and
moisture content – 5-9%.
With his integrated automatic burner cleaning system, as well as the module for forced cleaning
of the burner, this boiler is not pretentious about the quality of the pellets. It works with all type
of wood pellets intended for domestic usage, according to the ÖNORM M7135, DIN 51731, DIN
Plus standards.
Regardless of the pellets, which are used, after correct adjustment of the combustion process
could be reached efficiency of 90-94% and low emission of greenhouse gases CO, CO
2
and
NO
X
.
In case of changing the quality of pellets or the supplier during the exploitation, the parameters
of the combustion process should be reset. This should be done only by authorized service
organization. There is a possibility to save up to three different setting for different quality of
pellets.
8. Commissioning
8.1 Filling the installation
Filling the installation, filling with fuel and check the integrity of the unit
•
After the installation of the boiler and its connection to the heating and electrical systems,
could proceed to filling of the boiler body and heating installation with water. All types of
connections inside and outside the boiler should be visually inspected for leaks.
•
To ensure enough quantity of pellets, which is needed for initial start of the pellet boiler,
½ of the volume of the pellet storage tank should be filled.
•
Verify the position of the ceramic element in the combustion chamber
•
Verify of all electrical connections of the burner and the flexible pipe for compressed air.
•
Scheme for supply the burner and the compressor
•
After inspection turn the supply on, using the main switch.
8.2 Initial filling of the auger
Initial filling of the auger is required for the initial start up of the boiler or after the boiler stop due
to running out of fuel.
•
Take off the flexible connection for pellets from the burner;
•
From menu Setup choose level [6] (Manual feeding) – The initial feeding of the auger
with fuel and hold the button Enter, until the main auger is filled with fuel and the flow
become stable.
Содержание HP 30
Страница 2: ...User manual TANGRA HP30 Rev 04 2014 03 28 2...
Страница 4: ...User manual TANGRA HP30 Rev 04 2014 03 28 4...
Страница 5: ...User manual TANGRA HP30 Rev 04 2014 03 28 5...
Страница 22: ...User manual TANGRA HP30 Rev 04 2014 03 28 22 12 Appendix 12 1 Wiring diagram...
Страница 25: ...User manual TANGRA HP30 Rev 04 2014 03 28 25 13 2 Schemes of the main menu...
Страница 26: ...User manual TANGRA HP30 Rev 04 2014 03 28 26 13 3 Description of the functions...
Страница 27: ...User manual TANGRA HP30 Rev 04 2014 03 28 27...
Страница 31: ...User manual TANGRA HP30 Rev 04 2014 03 28 31...
Страница 32: ...User manual TANGRA HP30 Rev 04 2014 03 28 32...