background image

Tandberg Data 

StorageLoader 

Installing the “Rail Left Assembly” 

1.  Measure the length between the rear rack mount rails and the front rack 

mount rails. If the measurement is shorter than the StorageLoader, move the 
two sets of screws M4x12, washers and nuts shown in Figure 4. 

2.  Adjust the “Rail Left Assembly” to fit the measurement in step 1. 

3.  Use a 7 mm open-end wrench together with the screwdriver to tighten the 

two M4x12 screws to fix the rail length.

 Note

Using more than two screws 

will increase the stability of the Rack Mounting Kit.

 

4.  Place the “Rail Left Assembly” on the left side of the rack, between the rear 

rack mount rail and the front rack mount rail. 

5.  Mount the “Rail Left Assembly” at desired height using one M6x12 screw in 

front (upper hole in rail only) and two M6x12 screws at the backside. See 
figure 5. 

 

Installing the “Rail Right Assembly” 

Follow the instruction for left side only using the “Rail Right Assembly” on the 
right side of the rack. 

 

 

 

 

Step 5 

(Screw 
M6x12) 

Step 1 

Rear Rack 
Mount Rail 

Use these holes 
if rack depth is 
equal or longer 
than the 
StorageLoader 

Step 1

 

Holes to be 
used if rack 
depth is shorter 
than the 
StorageLoader 

Front Rack Mount Rail 

Step 5 

(Screw M6x12)

Step 2

 

Step 3

 

(Screw M4x12, 
nut and washer) 

 

 

Figure 4. Mounting the Rack mounting kit to a rack 

 

8

 

StorageLoader Quick Installation Guide 

Содержание StorageLoader

Страница 1: ...TANDBERG DATA StorageLoaderTM QUICK INSTALLATION GUIDE TANDBERG DATA ASA P O Box 134 Kjels s N 0411 OSLO NORWAY Phone 47 22 18 90 90 Telefax 47 22 18 95 50 Tandberg Data ASA Part No 433060 02 May 2005...

Страница 2: ...ich patents are granted or pending By publishing this information Tandberg Data ASA conveys no license under any patent or any other rights Every effort has been made to avoid errors in text and diagr...

Страница 3: ...er On Selftest 11 Step 6 Setting the SCSI Address 11 Step 7 Connecting the SCSI Bus Cable 12 Step 8 Connecting the Ethernet Connector 13 Step 9 Restarting Your System 14 Step 10 BCR Labeling of cartri...

Страница 4: ...wing the instructions displayed on the front panel Select the appropriate SCSI ID s and unit options Connect the SCSI interface cable and optionally the Ethernet cable Install the backup application s...

Страница 5: ...contents of the shipping container to be sure that all parts were included in the shipment A standard package for the StorageLoader consists of the following items A factory assembled StorageLoader un...

Страница 6: ...low around the front and back of the StorageLoader is not obstructed There is a minimum of 60cm free space in front of the unit to allow the operator to safely remove the magazines The display and ope...

Страница 7: ...aution Consider rack stability when deciding where to place the StorageLoader hazardous conditions can be the result of uneven mechanical loading of a rack StorageLoader 1U uses 1U of vertical rack sp...

Страница 8: ...Assembly on the left side of the rack between the rear rack mount rail and the front rack mount rail 5 Mount the Rail Left Assembly at desired height using one M6x12 screw in front upper hole in rail...

Страница 9: ...o the Rack Make sure that all the screws in the Rack Mounting Kit are tightened properly before installing the StorageLoader in the rack Slide the StorageLoader on the rails from the front of the rack...

Страница 10: ...system 2 Plug the power cable into the rear of the StorageLoader see figure 9 Plug the other end of the cable into a properly grounded electrical outlet Note Reliable earthing depends on earthing in...

Страница 11: ...robot if you need to return your StorageLoader to the supplier for service or repair Important The warranty does not cover damage to the loader shipped without the locking screw properly installed Ste...

Страница 12: ...ation and User manual for details You may also wish to reserve a magazine slot for a cleaning cartridge and set a security password at this time Changing some of these settings causes the StorageLoade...

Страница 13: ...ure the cable with the thumbscrews on the connector 3 Connect the other end of the SCSI cable to the appropriate SCSI adapter on your system and fasten it with the thumbscrews 4 If the StorageLoader i...

Страница 14: ...m power on until it s active on the SCSI bus It is recommended to turn on the power at least 40 seconds before the computer system is started Step 10 BCR Labeling of cartridges If your loader is equip...

Страница 15: ...Tandberg Data StorageLoader Figure 13 Positioning of bar code label for DLT cartridges StorageLoader Quick Installation Guide 15...

Отзывы: