background image

Tandberg Data 

StorageLoader 

 

 

Use one M5x8 screw on both left 
and right side (M5-thread) to 
fasten the StorageLoader to the 
rails’ backside. 

Figure 8. Fasten the rear of the StorageLoader to the rails. 

Step 3. Connecting Power Cable 

Before connecting the StorageLoader to your host computer system you should run 
the self-diagnostic of the unit. This preparation requires power to the StorageLoader. 
Go through the following steps to perform this test: 

1.  Use the power cables from the accessories included in the shipment. Make 

sure you select the power cord suited for your power system. 

2.  Plug the power cable into the rear of the StorageLoader (see figure 9). Plug 

the other end of the cable into a properly grounded electrical outlet. 

Note

Reliable earthing depends on earthing in the AC electrical outlet, in which the 

StorageLoader’s power cable is connected. Adding the StorageLoader to an existing 
rack installation can cause a leaking current fault condition because of the 
summation of the leaking currents. For security, a 250V 2A (H) fuse is located near 
the power switch. 

 

 

3.  Turn on the StorageLoader by 

switching the Power Switch to 
“1”.  
If the transport lock is present the 
loader will detect this and 
instruct the user to remove it, see 
next step. 

 

Figure 9. Power switch, fuse holder 

and power cord connection 

10

 

StorageLoader Quick Installation Guide 

Содержание StorageLoader

Страница 1: ...TANDBERG DATA StorageLoaderTM QUICK INSTALLATION GUIDE TANDBERG DATA ASA P O Box 134 Kjels s N 0411 OSLO NORWAY Phone 47 22 18 90 90 Telefax 47 22 18 95 50 Tandberg Data ASA Part No 433060 02 May 2005...

Страница 2: ...ich patents are granted or pending By publishing this information Tandberg Data ASA conveys no license under any patent or any other rights Every effort has been made to avoid errors in text and diagr...

Страница 3: ...er On Selftest 11 Step 6 Setting the SCSI Address 11 Step 7 Connecting the SCSI Bus Cable 12 Step 8 Connecting the Ethernet Connector 13 Step 9 Restarting Your System 14 Step 10 BCR Labeling of cartri...

Страница 4: ...wing the instructions displayed on the front panel Select the appropriate SCSI ID s and unit options Connect the SCSI interface cable and optionally the Ethernet cable Install the backup application s...

Страница 5: ...contents of the shipping container to be sure that all parts were included in the shipment A standard package for the StorageLoader consists of the following items A factory assembled StorageLoader un...

Страница 6: ...low around the front and back of the StorageLoader is not obstructed There is a minimum of 60cm free space in front of the unit to allow the operator to safely remove the magazines The display and ope...

Страница 7: ...aution Consider rack stability when deciding where to place the StorageLoader hazardous conditions can be the result of uneven mechanical loading of a rack StorageLoader 1U uses 1U of vertical rack sp...

Страница 8: ...Assembly on the left side of the rack between the rear rack mount rail and the front rack mount rail 5 Mount the Rail Left Assembly at desired height using one M6x12 screw in front upper hole in rail...

Страница 9: ...o the Rack Make sure that all the screws in the Rack Mounting Kit are tightened properly before installing the StorageLoader in the rack Slide the StorageLoader on the rails from the front of the rack...

Страница 10: ...system 2 Plug the power cable into the rear of the StorageLoader see figure 9 Plug the other end of the cable into a properly grounded electrical outlet Note Reliable earthing depends on earthing in...

Страница 11: ...robot if you need to return your StorageLoader to the supplier for service or repair Important The warranty does not cover damage to the loader shipped without the locking screw properly installed Ste...

Страница 12: ...ation and User manual for details You may also wish to reserve a magazine slot for a cleaning cartridge and set a security password at this time Changing some of these settings causes the StorageLoade...

Страница 13: ...ure the cable with the thumbscrews on the connector 3 Connect the other end of the SCSI cable to the appropriate SCSI adapter on your system and fasten it with the thumbscrews 4 If the StorageLoader i...

Страница 14: ...m power on until it s active on the SCSI bus It is recommended to turn on the power at least 40 seconds before the computer system is started Step 10 BCR Labeling of cartridges If your loader is equip...

Страница 15: ...Tandberg Data StorageLoader Figure 13 Positioning of bar code label for DLT cartridges StorageLoader Quick Installation Guide 15...

Отзывы: