Tandberg Data
StorageLoader
Use one M5x8 screw on both left
and right side (M5-thread) to
fasten the StorageLoader to the
rails’ backside.
Figure 8. Fasten the rear of the StorageLoader to the rails.
Step 3. Connecting Power Cable
Before connecting the StorageLoader to your host computer system you should run
the self-diagnostic of the unit. This preparation requires power to the StorageLoader.
Go through the following steps to perform this test:
1. Use the power cables from the accessories included in the shipment. Make
sure you select the power cord suited for your power system.
2. Plug the power cable into the rear of the StorageLoader (see figure 9). Plug
the other end of the cable into a properly grounded electrical outlet.
Note
:
Reliable earthing depends on earthing in the AC electrical outlet, in which the
StorageLoader’s power cable is connected. Adding the StorageLoader to an existing
rack installation can cause a leaking current fault condition because of the
summation of the leaking currents. For security, a 250V 2A (H) fuse is located near
the power switch.
3. Turn on the StorageLoader by
switching the Power Switch to
“1”.
If the transport lock is present the
loader will detect this and
instruct the user to remove it, see
next step.
Figure 9. Power switch, fuse holder
and power cord connection
10
StorageLoader Quick Installation Guide