![Tamson Instruments TV12 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/tamson-instruments/tv12/tv12_user-manual_3451932021.webp)
www.tamson.com
[email protected]
van 't Hoffstraat 12
2665 JL Bleiswijk, The Netherlands
T. 31 (0) 10 522 43 73
tv12-man Rev 2.0 UK 1017
Tamson Instruments bv
Page 21/29
ISO 9001 : 2015
NL/PRO 238239125
VAT: NL 80 66 34 984 B01
Bank account no.:
NL28 INGB 0007 350 370
NL95 RABO 0160100046
Chamber of commerce 27 16 95 41
8.2 Manual tuning
The parameters for the PID control can be changed
manually.
The control of the PID parameters allow setting of the I
and D values to zero. The bath will then function as a
propo
rtional system. The “P” parameter can than be
varied to an optimal value by trial and error. A higher P
will stabilize the system when I and D are off.
The PID paramters can also be determined with the use
of the Ziegler Nichols method described below. With the
proces at its normal proces value.
Set the integral time “Ti” and the derivative Time “Td” to
off. Check if the Lcb and Hcb are set to auto.
Ignore the fact that the temperature may not settle
precisely at the set point. If the temperature is stable,
reduce the proportional band Pb so that the temperature
just starts to oscillate. If the temperature is already
oscillating, increase the proportional band until it begins
oscillating. Allow enough time between each adjustment
for the loop to stabilize. Make a note of the proportional
band value “B” and the period of oscillation “T” Set the
Pb, Ti and Td parameter values according to the
calculations given in the table below:
Type of control
Proportional band
Integral time "
ti
"
Derivative Time "
td
"
Proportional only
2xB
Off
Off
P + I control
2,2xB
0,8xT
Off
P + I + D control
1,7xB
0,5xT
0,12xT