
TP-60BA (Rev 2.2)
- 33 -
TALON TECH CO. LTD.
8-4 Installation Method
8-4-1 Pump Installation Sequence
1. Prepare the space for the pump installation.
2. As per the below picture, tighten the panel base plate with 4 pieces of M4 screw.
8-4-2 Piping Method
1. PR Tube Piping
1) Insert
⅜”
union nuts on tube at PR In / Out / Vent areas.
2) Position between PR bottle and Pump max. closely
3) At the vent area, insert
⅜”
sleeve into tube after enlarging tube with the tube expansion tool
and then tighten nut.
Make 3.4mm hole and Tap M4.
M4 Tap 4ea
⅜”
Union Nut
⅜”
Sleeve
PR Drain
PR Out
Содержание TP-60BA
Страница 34: ...TP 60BA Rev 2 2 31 TALON TECH CO LTD 8 2 Pump Dimensions 8 2 1 Front View 8 2 2 Side View ...
Страница 35: ...TP 60BA Rev 2 2 32 TALON TECH CO LTD 8 3 Touch Pad Dimensions 8 3 1 Front View 8 3 2 Rear View 7 3 3 Side View ...
Страница 39: ...TP 60BA Rev 2 2 36 TALON TECH CO LTD THE END ...