background image

    

INSTALLATION  MANUAL FOR CRYSTALLINE SOLAR PHOTOVOLTAIC MODULES 

     

Version: A2         Effective Date: May 13, 2015 

 

ZHONGLI TALESUN SOLAR COMPANY LIMITED 

Address: No. 1 Talesun Road, Changkun Industrial Park, Shajiabang Town, Changshu, Suzhou, Jiangsu Province, 215542, P.R.China 

Website: 

www.talesun.com

    Email: 

[email protected]      

 Tel: +86 400 885 1098 

4 / 19 

 

shock. 

2.2

 

PRODUCT PRECAUTION

 

 

Do not attempt to disassemble the modules. 

 

Do not remove any attached nameplates or components from the modules. 

 

Do not open the junction box under any circumstances.  

 

Only carry out modifications to the modules that have been confirmed by Talesun in 
writing in advance.  

 

Do not carry out any extra drilling (e.g. for fasteners) on the modules.  

 

Use only insulated tools that are approved for work on electrical installations.  

 

Do not use light concentrators (e.g. mirrors or lenses) to attempt to increase the    capacity of the module. The module 
may be damaged. This also voids the warranty. 

 

2.3

 

TRANSPORT AND STORAGE SAFETY GUIDELINES 

Inappropriate transport and installation may break the module. To prevent damage of the modules: 

 

Transport the modules in their original packaging until installation.  

 

Store the modules securely in cool and dry rooms. The packaging is not weather-resistant! 

 

Protect the modules against scratches and other damage, especially from impact at the edges or improper storage. 

 

Ensure modules do not bow under their own weight. 

 

Do not rest a module unprotected on its edges. This can damage the module and the frame. 

 

Do not lift or move the modules using the cables or at the junction box under any circumstances!  

 

Do not set the modules down hard on any surface. 

 

  Do not subject the module surfaces to mechanical stress.  

 

  Do not stand on the modules.  

 

  Do not drop or place objects on the modules.  

 

3

 

MECHANICAL INSTALLATION

 

 

3.1

 

SELECTING THE LOCATION 

 

The modules are certified according to the norm IEC 61215 and others for safe operation in moderate climates. The 
operator needs to consider the effect of the high altitude on the operation of the module, when the modules are 
installed at high altitude. 

 

Do not expose the modules to chemicals. 

 

Do not place the modules in standing water. The junction box is splash-proof only. 

 

Do not install the modules near flammable gases and vapors (e.g. gas containers) or near open flames and flammable 
materials. Solar modules are not explosion-proof operating equipment.  

 

If there is exposure to salt (i.e., marine environments) and sulfur (i.e., sulfur sources, volcanoes), there is a risk of 
corrosion. 

 

A module is considered shade-free when it is entirely unshaded throughout the year (e.g. by buildings, chimneys, 
trees). Even partial shading of the modules (e.g. by overhead lines, dirt, snow) should be avoided. 

 

3.2

 

SELECTING THE PROPER SUPPORTING FRAME 

Always observe the instructions and safety precautions included with the support frames to be used with the modules. 

Содержание TP572M-170

Страница 1: ...kun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Email sales talesun com Tel 86 400 885 1098 INSTALLATION MANUAL For crystalline solar phot...

Страница 2: ...POSE OF THE MANUAL 1 2 DISCLAIMER OF LIABILITY 1 3 PRODUCTION IDENTIFICATION 2 SAFETY GUIDELINES 2 1 GENERAL SAFETY GULDELINES 2 2 PRODUCT PRECAUTION 2 3 TRANSPORT AND STORAGE SAFETY GUIDELINES 3 MECH...

Страница 3: ...f the solar installation Information for operators Keep these instructions safe for the entire useful life of the solar installation Please contact your plant supplier for information concerning the f...

Страница 4: ...eries Cover the solar modules with opaque material for the entire duration of assembly Only then is the module reliably de energized Never disconnect plugs when under load Be aware that even without t...

Страница 5: ...es or improper storage Ensure modules do not bow under their own weight Do not rest a module unprotected on its edges This can damage the module and the frame Do not lift or move the modules using the...

Страница 6: ...stem The modules may be installed in landscape or portrait format Install the module in such a way that the junction box is positioned in the upper area of the module and the wires hang downwards The...

Страница 7: ...frame Modules should be bolted to support structures through mounting holes located in the frame s back flanges only Do not drill additional holes Doing so will void the warranty Each module must be s...

Страница 8: ...ructions above b Clamping installation Modules can be installed with clamps Modules must be securely attached to the mounting structure with four clamps on the long frame The modules must be properly...

Страница 9: ...990mm 40mm 2400Pa 250mm 100mm 5400Pa 250mm 100mm TP648 series 1324mm 990mm 35mm 2400Pa 200mm 100mm 5400Pa 200mm 100mm 1324mm 990mm 40mm 2400Pa 200mm 100mm 5400Pa 200mm 100mm TP572 series 1580mm 808mm...

Страница 10: ...nsure that the construction or structure roof facade support etc where the modules are being installed is strong enough to support the weight of the modules and all other system components If modules...

Страница 11: ...ed There is no preparation required Spacing Care must be used to avoid interference between adjacent grounding clips and other components for removal of the grounding clip Removal The wire can be remo...

Страница 12: ...rsion A2 Effective Date May 13 2015 ZHONGLI TALESUN SOLAR COMPANY LIMITED Address No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website w...

Страница 13: ...Date May 13 2015 ZHONGLI TALESUN SOLAR COMPANY LIMITED Address No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Ema...

Страница 14: ...ever doing so will void warranty unless this exchange is made by an authorized person Protect yourself from electric shocks while debugging or maintaining the solar power system 5 2 TROUBLESHOOTING DA...

Страница 15: ...Mono crystalline 5inch 72cells Mono crystalline Dimension mm 1960 990 40 1960 990 45 1960 990 50 1640 990 35 1640 990 40 1580 808 35 1580 808 40 Weight kg 24 19 14 7or15 Module Type TP672P TP660P TP6...

Страница 16: ...290 1000 IEC 290 36 4 7 97 45 3 8 63 TP672M 285 1000 IEC 285 36 2 7 88 45 2 8 53 TP672M 280 1000 IEC 280 36 2 7 74 45 1 8 41 TP660M 275 1000 IEC 275 31 1 8 85 38 3 8 95 15 TP660M 270 1000 IEC 270 31 8...

Страница 17: ...290 35 9 8 09 44 7 8 72 TP672P 285 1000 IEC 285 35 8 7 97 44 6 8 65 TP672P 280 1000 IEC 280 35 7 7 86 44 5 8 56 TP672P 275 1000 IEC 275 35 5 7 76 44 4 8 49 TP672P 270 1000 IEC 270 35 4 7 64 44 3 8 4 T...

Страница 18: ...215542 P R China Website www talesun com Email sales talesun com Tel 86 400 885 1098 17 19 TP572M 205 1000 IEC 205 37 5 5 49 45 7 5 92 TP572M 200 1000 IEC 200 37 3 5 42 45 5 5 85 TP572M 195 1000 IEC...

Страница 19: ...86 400 885 1098 TEL 86 512 8235 5888 FAX 86 512 8235 5588 JAPAN 6F 3 22 1 Toranomon Minato ku Tokyo Japan 105 0001 Email japan talesun com Web www talesun com jp T 03 5733 3498 F 03 34341515 USA 111 W...

Страница 20: ...s No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Email sales talesun com Tel 86 400 885 1098 19 19 THAILAND Thai C...

Отзывы: