www.aebikes.com.au
|
|
page 013
Inspection of handlebar and seat
•
Please check handlebars and seat are in the proper position and well fixed.
•
If you find any problems during the inspection, please read the related content of this manual or contact the local dealer
for solution.
Battery Pack Pull Out
• Switch off the key switch and take key to unlock the battery pack holder cover. The battery pack will then be in sight.
• Switch off the circuit breaker, unplug the battery pack discharge connector, and then pull out the battery pack by
lifting upward.
Battery Pack Installation
• Use the key to unlock the battery pack holder cover.
•
Install the battery pack by pulling downward, however please pay attention to the direction (battery pack
charging interface should be on the left side). After the battery pack is installed properly, plug in the battery pack
discharging connector, and switch on the circuit breaker. Finally, lock the battery pack holder cover, and take out
the key.
WARNING.
• Before pulling out or installing the battery pack, please switch off the circuit breaker.
•
The battery pack discharge connector should be correctly plugged in. Otherwise, the battery will not be identified,
causing the electric motorcycle failure to run.
Содержание STING
Страница 1: ...OWNERS MANUAL ...
Страница 31: ...www aebikes com au sales aebikes com au page 027 CIRCUIT DIAGRAM ...