78
OPERATION
(1) Offset the boom to the front of the
operator’s seat and move the boom near
the cab.
Offset the boom to the right and move
the bucket near the cab.
(2) Offset the boom fully to the right and
check that it can be set to the maximum
rear inclination.
(3) Offset to the left in the posture in (2)
above
Operation when the boom has stopped
automatically
1. If the boom has stopped while rising:
Operate the boom downward.
2. If the boom has stopped while offsetting
to the left:
a. Operate the boom downward to move
it outside the automatic stop range.
b. Offset to the left.
Offsetting to the right is possible
regardless of the boom’s posture.
1
L2D009
2
3
L2D010
Machine Operation
Содержание TB153 FR
Страница 6: ...4...
Страница 8: ...6...
Страница 45: ...43 MEMO...
Страница 68: ...66...
Страница 89: ...87 MEMO...
Страница 108: ...106...
Страница 177: ...175 SPECIFICATIONS Main Specifications 176 Machine Dimensions 178 Operating Range 180 Lifting Capacities 183...
Страница 180: ...178 SPECIFICATIONS Machine Dimensions...
Страница 182: ...180 SPECIFICATIONS Operating Range J1K0021 D J H K C F G A E B...
Страница 184: ...182 MEMO...
Страница 194: ...192...
Страница 225: ...223 MEMO...
Страница 230: ...228...
Страница 231: ...229 INDEX...