
Moistureproof Sheet
Moistureproof
Packing
Moistureproof Packing
Seal a space
around here
5-4. Fix the Moistureproof sheet and packing
Please obtain the moistureproof sheet and the moistureproof packing to prevent from the
main body damaged by the moisture. Deterioration and the breakdown of structural parts
and electrical equipments might not be occurred without the installation.
1. Fix the moistureproof sheet on the floor.
Plywood Floor : Wood Screw
Concrete Floor : Glue
2. Make a cut in the moistureproof packing according to piping position.
3. Peeled off the sheet on the adhesive face side of the moistureproof packing. Passes under the
piping and electric code on the moistureproof packing and attach to the floor.
4. Seal a space around the piping and electric code.
5-5. Installation of unit
1. Remove the four tapping screw(M8 x 60mm) fixing the
unit base plate to the pallet.
Marking
Water Supply
Hot Water Pipe
Drain Pipe
Power Outlet
Pipe
5-3. Marking for unit fixing position
Use supplied full scale
template to mark the
fixing position on the floor. Check the piping
and power outlet position before marking.
1. Put the supplied templete on the floor and hold with
the tape etc. It should be set to the position of
piping and power outlet.
2.
The chair fixing position is marked on the floor.
3. Make it holes for marked position. (8.5 mm x 50 mm )
4. Remove the template from the floor.
Base
Tapping Screw(M8 x 60)
Pallet
-6-