Water Piping
Follow local guidelines for the length of the
plumbing line in order to ensure that there is
enough water pressure for all the fixtures on the
line. First, calculate the effective length of the
plumbing line by measuring the total length of pipe,
and then adding to this 5’ for each elbow or tee in
the line. Use the following chart to determine the
total number of fixture units on the line, and then
compare with the chart at the bottom of this page
to find the pipe diameter and water pressure
necessary.
Install with control valves on the inlet and outlet,
and use removable unions or connectors to
facilitate maintenance or service if necessary.
If the water heater is installed in a closed water
system, means shall be provided to control thermal
expansion. Contact the water supplier or a local
plumbing inspector on how to control this situation.
Important:
Purge the water line of air, and clean
the filter before initial operation.
WARNING
: Do not reverse the hot outlet and cold
supply line connections to the Flash Water Heater.
Make sure the hot and cold lines are connected as
in the FOR YOUR SAFETY section at the front of
this manual.
Pressure Relief Valve
An approved pressure relief valve must be
installed in any installation with this unit. The
pressure relief valve must be installed on the hot
line out of the unit, with no check valves or control
valves between the unit and the relief valve.
The Pressure relief valve must be rated for 150
PSI. Connect the discharge opening of the relief
valve to a suitable drain to prevent water damage
should discharge occur.
If the pressure relief valve discharges periodically,
this may be due to thermal expansion in a closed
water supply system. Contact the water supplier or
local plumbing inspector on how to correct this
situation.
Do not plug the pressure relief valve. The line
should have no reduced fittings or other
restrictions and should allow for complete drainage
of valve and line. The pressure relief valve should
be manually operated once a year to check for
correct operation.
Length
to the End of Hot Water Line and
Recommended
Fixture Units
Pressure Range 30 to 45 PSI
Pressure Range 46 to 60 PSI
Pressure Range 60+ PSI
Pipe
Size
100
'
200
'
300
'
400
'
100
'
200
'
300
'
400
'
100
'
200
'
300
'
400
'
3/4
"
3-12
1-6
1-5
0-4
5-17
3-11
2-8
1-6
6-20
4-13
3-10
2-8
1
"
12-25
6-17
5-13
4-12
17-36
11-25
8-20
6-18
20-39
13-32
10-26
8-22
1-1/4
"
25-48
17-32
13-25
12-21
36-78
25-52
20-39
18-33 39-78
32-74
26-54
22-43
Fixture Unit Per Fixture (from UPC)
Plumbing Fixture
Description
Fixture
Unit
Combination Bath / Shower
4
Whirlpool Bath
4
Shower
2
Lavatory
1
Clothes Washer
4
Dishwasher
1.5
Kitchen Sink
1.5
Содержание Flash Water Heater T-KD20
Страница 8: ...8 ...
Страница 20: ...20 ...
Страница 24: ...24 Computer board assembly ...
Страница 25: ...25 Case assembly ...
Страница 26: ...26 Burner assembly ...
Страница 27: ...27 Waterway assembly ...