11. TROUBLESHOOTING AND MAINTENANCE
Daily Maintenance
11-9
5. Inspections
6. Repair
WARNING
During machine inspection, turn OFF the primary power supply. (Before disconnecting the pri-
mary power supply, turn OFF the power switch.) You could sustain severe injuries due to being
entangled by moving machine units.
Inspection Point
Contents
Cycle
(1) Each belt of main shaft drive system
Tension and wear of belt, Existence of crack
Once/3 months
(2) Each belt of X/Y-axis drive system
Tension and wear of belt, Existence of crack
(3) Rotating and sliding sections
Degree of wear
WARNING
To prevent accidents resulting in injury or death and physical damage, the following must be
observed when performing the repairs of the machine.
Before starting repair of the machine, be sure to disconnect the primary power supply to the
machine and wait for 4 minutes. (Before disconnecting the primary power supply, turn OFF the
power switch.) It takes 4 minutes until the machine becomes completely discharged.
If the machine needs repairs, the repairs must be done only by the service personnel assigned
and trained by Tajima or qualified technician. (Consult the distributor.) Do not change the specifi-
cation nor modify the parts of the machine. Such modification could risk the operational safety.
When restarting the machine after repairs, attach all covers, etc., which were removed for the
repair operation.
CAUTION
For the machine repairs, use TAJIMA genuine parts for replacement.
JZ05
!
Содержание NEO TEJTII-C
Страница 1: ...M IC2 01 E 2006 05 USER S MANUAL COMPACT SEWING MACHINE NEO ...
Страница 11: ...1 6 1 Important warning items for safe operation Warning labels ...
Страница 49: ...4 12 4 DATA SET MENU Initial memory ...
Страница 54: ...6 DESIGN EDIT Size 6 2 Rotate 6 3 Mirror 6 4 Repeat 6 5 Edit JZ05 ...
Страница 83: ...8 8 8 FRAME SETTING Trace ...
Страница 95: ...9 12 9 Manual operation Frame back ...
Страница 111: ...11 10 11 TROUBLESHOOTING AND MAINTENANCE Daily Maintenance ...