11-6
11. TROUBLESHOOTING AND MAINTENANCE
Daily Maintenance
2. Cleaning
1-needle machine does not have case linear.
WARNING
Before starting cleaning of the machine, be sure to disconnect the primary power to the
machine and wait for four minutes. You could sustain electric shock or injury due to being entan-
gled by the machine.
The maintenance operations must be performed by properly trained personnel.
When restarting the machine after maintenance operation, attach all covers, etc., which were
removed for maintenance operation.
Cleaning area
Cleaning cycle
(1) Case linear section
Once a week
(2) ATH section
Everyday
(3) X/Y-axis drive system
Once/2 weeks
JZ05
2
1
3
3
Содержание NEO TEJTII-C
Страница 1: ...M IC2 01 E 2006 05 USER S MANUAL COMPACT SEWING MACHINE NEO ...
Страница 11: ...1 6 1 Important warning items for safe operation Warning labels ...
Страница 49: ...4 12 4 DATA SET MENU Initial memory ...
Страница 54: ...6 DESIGN EDIT Size 6 2 Rotate 6 3 Mirror 6 4 Repeat 6 5 Edit JZ05 ...
Страница 83: ...8 8 8 FRAME SETTING Trace ...
Страница 95: ...9 12 9 Manual operation Frame back ...
Страница 111: ...11 10 11 TROUBLESHOOTING AND MAINTENANCE Daily Maintenance ...