3-8
INSTALLATIONS
3.4.2 RT site Installation Steps
v
Power off all units.
v
Connect the E1 cable to the E1 network equipment.
v
Plug in the data port unit (V.35 or RS530 module) into the slot on RF.
v
Connect the DTE cable to the data port unit.
v
Connect the copper wires between CF & RF.
v
Turn on the power on all units.
v
Configure the units using LCD panel or the Craft interface on the RF unit
The
RT site
quick setup items from front panel are almost the same as CO site, the
system type is the only item to be different from this quick installation example.
1.
HDSL CONFIG
à
SYSTEM TYPE
à
E1-RF
After HDSL loops connect and change the necessary items above, the CO site will
download the configuration to RT site include clock source, then the system will be built
up.
Содержание DT-2000 Series
Страница 6: ...CHAPTER 1 INTRODUCTION CONTENT 1 1 General Description 1 2 Specifications 1 3 Module List...
Страница 7: ......
Страница 14: ...CHAPTER2 Unit Description CONTENT 2 1 General Description 2 1 1 Desktop Units 2 1 2 Rack Mounted Units...
Страница 15: ......
Страница 26: ...UNIT DESCRIPTIONS 2 11 This page is intentionally left blank...
Страница 27: ......
Страница 29: ......
Страница 41: ...3 12 INSTALLATIONS This page is intentionally left blank...
Страница 42: ......
Страница 69: ...4 26 OPERATING MAINTENANCE This page is intentionally left blank...