![Tahoe T../MA-ANJ series Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/tahoe/t-ma-anj-series/t-ma-anj-series_installer-manual_813719003.webp)
2
CONTROL VALVE SPECIFICATIONS
SERVICE FLOW RATE & PRESSURE
LOSS
(valve only, including bypass valve, but
not including mineral, etc.)
27 gpm (102.2 lpm) @ 15 psi (103 kPa)
ΔP
BACKWASH FLOW RATE &
PRESSURE LOSS
(whole conditioner, including bypass
valve)
27 gpm (102.2 lpm) @ 25 psi (103 kPa)
ΔP
MINIMUM & MAXIMUM OPERATING
PRESSURE
20 psi (138 kPa) – 125 psi (862 kPa)
MINIMUM & MAXIMUM OPERATING
TEMPERATURE
40 °F (4 °C) – 110 °F (38 °C)
CURRENT DRAW & VOLTAGE
0.5 amperes, 110 volts
REGENERANT TANK REFILL RATE
0.5 gpm (1.9 lpm)
INLET/OUTLET FITTING TYPES
(a) 1’’ NPT elbow
(b) ¾’’ & 1’’ PVC solvent weld socket
(c) 1’’ straight brass sweat fitting
(d) ¾’’ straight brass sweat fitting
DISTRIBUTOR TUBE
1.05’’ O.D. (3/4’’ U.S. PVC Pipe Size)
TANK THREAD
2½’’ – 8 NPSM
PC BOARD MEMORY
Nonvolatile EEPROM
(electrically erasable programmable
read only memory)
COMPATIBLE REGENERANTS
Sodium chloride, potassium chloride,
potassium permanganate, sodium
hydroxide, hydrochloric acid
COMPATIBLE CHEMICALS
Sodium bisulfate, sodium hydrosulfite,
chlorine, chloramines
GENERAL INSTRUCTIONS
During operation, the normal user displays such as time of day, capacity remaining before regeneration, flow
rate, and salt warning (optional), are shown. Each of these can be viewed by pressing NEXT to scroll
through them. When moving through any displays or programmings, if no buttons are pressed within five
minutes, the display returns to normal operating displays. Any changes made prior to the five minute time out
are incorporated.
To quickly exit any programming, Installer Settings, etc., press CLOCK. Any changes made prior to the exit
are incorporated.
If desired, two regenerations within 24 hours are possible with a return to the preset program. To do a double
regeneration if the control valve is factory set to “DELAYED REGEN” or “DELAY+IMMEDIATE” (see Step 9S
under SOFTENER SYSTEM SETUP):
1. Press and release the “REGEN” button. The words “REGEN TODAY” will periodically be shown on the
display.
2. Press and hold the “REGEN” button for three seconds until a regeneration begins.
Once the valve has completed the immediate regeneration, the valve will regenerate one more time at the
preset regeneration time
.
CYCLE SEQUENCE
CYCLE SEQUENCE instructions allows the setting of the order of the cycle. There are 9 cycles which can be
arranged in any order. Later in this book the INSTALLER SETTINGS allow the setting of how long cycles will
last.
END must be used as the last cycle option. The SERVICE cycle should only be used in brine prefill
applications.
If using upflow brine, verify that the valve is configured as follows:
1. Upflow piston is installed; and
2. Injector is located in up hole and injector plug is in down hole.
Содержание T../MA-ANJ series
Страница 13: ...12 REPLACEMENT PARTS ...
Страница 14: ...13 REPLACEMENT PARTS ...
Страница 15: ...14 REPLACEMENT PARTS ...
Страница 16: ...15 REPLACEMENT PARTS ...
Страница 17: ...16 REPLACEMENT PARTS ...
Страница 18: ...17 INSTALLATION FITTING ASSEMBLIES ...