4 / GRAND SLAM 1000
1. Using the drill template provided, align the long edge of the mount parallel with the edge of the
hardtop; verify the orientation of the template with the bow and stern markings.
2. Drill the four (4) 5/16" corner mounting holes through the top into the hollow core of the top.
3. Drill the 4” center hole into the hollow core of the top.
4. Drill the 2 -1/2” holes for tube fittings
INSTALLATION
Preparing Mount Locations
1. Prepare an area to mount the pump and manifold in a dry location. The overall distance between the
pump and the manifold cannot exceed two feet. (See diagram below.)
2. Mount the pump unit with the reservoir parallel to the edge of the hardtop with 4 – 1/4” bolts or #12
screws. It is most efficient to mount the pump to the left of the manifold. Mount the manifold either to
the right or below the pump assembly.
Note Port configuration (P #) in the recommended layout.
3. Route three (3) of the 1/4” vinyl tubing through the 4” hole in the top to the manifold assembly. Allow
2 feet of extra tubing at each end to ease installation to the fittings. Do this for both heads. Note: To
ease Identification of the tubes, it is prudent to number the tubes with either masking tape with a
number or color-code them with a colored marker.
4. Mount the control box in a dry environment within 3’ of the pump assembly using four (4) #12 screws.
5. Route the 6-pin sensor cable through the 4” hole in the top. Route the 6-pin sensor cable along with
the tubing to the control Box.
Note: On the control box, the receptacles are marked for port and starboard.
Mounting the Pump, Manifold and Control Box Assembly
Содержание GRAND SLAM 1000
Страница 9: ...GRAND SLAM 1000 9 Keypad Interface...
Страница 12: ...12 GRAND SLAM 1000 LEFT BLANK INTENTIONALLY...
Страница 14: ...INSTRUCT GS 1000...