background image

 

 

_________________________________________________________________________________________________________ 
VR 250 ECH/B 

 

Operation and maintenance instructions 

 
206610 (16-11-2010) 

2

 Systemair 

AB 

 

   GB 

Introduction 

Installation, operation and maintenance manual concerns air handling unit type VR 250 ECH/B 
manufactured by Systemair AB. It consists of basic instructions and recommendations concerning the 
design, installation, start-up and operation, which shall be obeyed to ensure proper and fail-free operation 
of the unit. For proper and safe operation, read this manual thoroughly. Use the unit according to 
guidelines given and follow all safety requirements. 

Table of contents 

Introduction ..................................................................................................................................... 2

 

Table of contents ............................................................................................................................. 2

 

Safety information ........................................................................................................................... 2

 

Warning! ...................................................................................................................................... 2

 

General ........................................................................................................................................... 3

 

Operation ........................................................................................................................................ 4

 

Airflow (Fan speed) ...................................................................................................................... 4

 

Supply air temperature ................................................................................................................ 5

 

Filter ............................................................................................................................................. 5

 

Summer operation ....................................................................................................................... 5

 

Manual summer operation ........................................................................................................... 5

 

Kitchen extraction ........................................................................................................................ 6

 

Maintenance .................................................................................................................................... 7

 

Changing extract/inlet filter .......................................................................................................... 7

 

Changing operation time between filter changes ......................................................................... 7

 

Checking the heat exchanger ...................................................................................................... 8

 

Checking the fans ........................................................................................................................ 8

 

Cleaning extract louvers and inlet diffusers ................................................................................. 8

 

Checking the fresh air intake ....................................................................................................... 8

 

Checking the duct system ............................................................................................................ 8

 

Troubleshooting .............................................................................................................................. 9

 

Service .......................................................................................................................................... 10

 

 
 
 
 
 

 

 
 

Safety information 

In order to avoid electrical shock, fire or other damage which might occur in connection with faulty use and 
operation of the unit, it is important to consider the following: 
 

Warning! 

 

The system should operate continuously, and only be stopped for maintenance and 
service

 

 

Beware of sharp edges when mounting and during maintenance. Use protective gloves!

 

 

Tumble dryer must not be connected directly to the ventilation system 

 

Make sure that filters are mounted in their place before running the system 

 

Before performing any maintenance or electrical work make sure that the mains supply is 
disconnected 

 

Maintenance must be performed according to below instructions.

Содержание VR-250 ECH/B

Страница 1: ...10 02 16 11 2010 VR 250 ECH B Air Handling Unit Operation and maintenance instructions GB GB...

Страница 2: ...operation 5 Manual summer operation 5 Kitchen extraction 6 Maintenance 7 Changing extract inlet filter 7 Changing operation time between filter changes 7 Checking the heat exchanger 8 Checking the fa...

Страница 3: ...ply of filtered and preheated outdoor air to residential areas and extract of a corresponding amount of used air from wet rooms and kitchen The unit is equipped with a heat exchanger block to ensure s...

Страница 4: ...hange Signal heater battery ON Fig 2 The unit is controlled from a separate controller with the following functions Airflow Fan speed Buttons to increase or decrease airflow in 3 steps 4 and 5 fig 2 L...

Страница 5: ...ated but the efficiency will be reduced if the filter is not replaced Operation time 6 9 or 12 months between filter changes can be set on the control panel see installation instructions From factory...

Страница 6: ...cooker is led directly through the extract fan and not through the heat exchanger The capacity of the extract fan is then primarily used for extract from the cooker but a minor airflow is maintained...

Страница 7: ...y Contact your supplier for new filter Operation time between filter changes must be re set after filter change Press button 13 fig 2 for approx 5 seconds Yellow lamp 14 and one of the green lamps 6 7...

Страница 8: ...sary the fans can be pulled out for cleaning with a soft brush Do not use water White spirit can be used to remove obstinate settlements Allow to dry properly before remounting Cleaning extract louver...

Страница 9: ...pulling out the plug for 20 30 seconds 4 Cold supply air a Check set supply air temperature on the control panel b Check if fire thermostat is still alert If necessary reset by pressing the red butto...

Страница 10: ...nintended rotor stop belt breakage defective motor 1 1 Missing zero crossing detector 1 1 Voltage too low 210 V Lamps 6 7 and 8 are flashing in accordance with set inlet air temperatures see Operation...

Страница 11: ...10 02 Systemair AB Industriv gen 3 739 30 Skinnskatteberg Sweden Phone 46 222 440 00 Fax 46 222 440 99 www systemair com 206610 16 11 2010...

Отзывы: