9
4.3
Condensation drain
The unit must be connected to the condensation drain, which is enclosed upon delivery. The drainage needs to be con-
nected on the exhaust air side of the heat exchanger at the bottom of the unit figure 7. If the unit is to be used for cool
recovery the normally plugged drainage outlet needs to be connected as well to a separate tube and water lock
(accessories).
Use the enclosed connection tube, which needs to be cut down to the appropriate height. See table 2 how the height
“H” corresponds to different maximum negative pressures. See figure 8 for dimensions and assembly.
Note:
When installed in a non heated place the drain pipe and trap needs to be insulated well to prevent the water
from freezing.
Fig. 7 Drainage connection
Fig. 8 Dimension and assembly
Table 2
H (mm)
Max. Negative
pressure (Pa)
65
300
95
1
600
135
1000
1
Normal conditions
137667 | A001
Содержание Topvex SC03-11
Страница 4: ......
Страница 12: ...8 Installation Fig 5 Fig 6 137667 A001 ...