SystemAir fantech ECHO 2800Xi Series Скачать руководство пользователя страница 1

ECHO

 

 2800Xi Series

 Light Commercial Heat/Energy Recovery Ventilators

Installation, Operation and Maintenance Manual

Item #: 422974

Rev Date: 2021-10-20

Your ventilation system should be installed in conformance with the appropriate provincial/state requirements or, in the 
absence of such requirements, with the current edition of the National Building Code, and / or ASHRAE’s “Good Engineering 
Practices”.

Fantech reserves the right to modify, at any time and without notice, any or all of its products’ features, designs, 
components and specifications to maintain their technological leadership position. 
Please visit our website www.fantech.net for more detailed technical information.

United States

10048 Industrial Blvd., Lenexa, KS, 66215
Tel.: 800.747.1762 • Fax: 800.487.9915

Canada

50 Kanalflakt Way, Bouctouche, NB, E4S 3M5
Tel.: 800.565.3548 • Fax: 877.747.8116

®

Содержание fantech ECHO 2800Xi Series

Страница 1: ...on of the National Building Code and or ASHRAE s Good Engineering Practices Fantech reserves the right to modify at any time and without notice any or all of its products features designs components a...

Страница 2: ...d with BPM module only 21 o Extended running 23 o Fire alarm 26 o External switch 26 Alarm handling 27 Configuring BACnet MS TP port 1 29 Maintenance 31 Limited warranty 32 Parts list 33 The key to pr...

Страница 3: ...clothes dryer kitchen exhaust hoods combustion venting central vacuum system These appliances may cause lint dust or grease to collect in the HRV ERV damaging the unit Location The HRV ERV must be pr...

Страница 4: ...used to recirculate indoor air when ventilation is not required See the Recirculation section for more details If a BPM module accessory has been supplied with the unit it should be installed as per...

Страница 5: ...ned and sealed to the ducts with proper duct sealant to minimize air leakage Dampers fitted to the ductwork connecting the unit to the outside weather hoods should be adequately insulated in order to...

Страница 6: ...esponsibility of the installer to ensure all ductwork is sized and installed as designed to ensure the system will perform as intended The amount of air CFM that an HRV ERV will deliver is directly re...

Страница 7: ...he return air side and can be accessed by opening the larger hinged access panel Pressure transducer modules Each module has two 2 pressure transducer The first pressure transducer on the PTE module m...

Страница 8: ...nting holes 8 Connection block 9 Connection to yellow cable 10 Connection to orange cable 11 Connection to red cable 12 Connection to brown cable 13 Connection to black cable Supplied Cable 10 12 11 1...

Страница 9: ...hanges from stopped to starting up 2 The digital outputs for the fresh air damper and the exhaust air damper are activated 3 The exhaust air fan and the supply air fan will start after a preset time N...

Страница 10: ...e and time follow the steps below Time settings schedule 1 Time settings Go to Time settings by using the UP DOWN arrow buttons Select by pressing the RIGHT arrow button Temperature Air Control Time s...

Страница 11: ...be done when ventilation is not required during a certain period but air circulation is desired Recirculation units equipped with the BPM module only To have the recirculation mode controlled by a dig...

Страница 12: ...ow button Manual Auto Settings Configuration Access rights Once the input has been set the recirculation mode can be configured 3 Recirculation Using the UP DOWN arrow buttons locate the use extra tim...

Страница 13: ...cess the fields and set values Extended running 0 min Set the time value for extended running to remain active once the extended running input goes from on to off Time in ext running 0 min This field...

Страница 14: ...ing the UP DOWN arrow buttons Select by pressing the RIGHT arrow button AI DI UI AO Alarm handling The unit controller comes with preprogrammed alarms to ensure it functions properly and to help troub...

Страница 15: ...isplay Follow the steps below to handle active alarms 1 Access the alarm log Press the alarm button to access the alarm log when the red LED is flashing to indicate that an alarm has been triggered On...

Страница 16: ...n a large sink bathtub or shower 5 Pour clean tap water through the face of the core facing upward until it runs clear Ensure the entire surface is rinsed 6 Rotate the core so that its other air inlet...

Страница 17: ...ges incurred in the use of the ventilation system Fantech is not responsible for providing an authorized service centre near the purchaser or in the general area Fantech reserves the right to supply r...

Страница 18: ...35 34 Notes Notes...

Страница 19: ...Fantech reserves the right to make technical changes For updated documentation please refer to www fantech net Fantech...

Отзывы: