background image

 

 

Maintenance/troubleshooting 

DVV 16.08.2021 

15 

VDMA 

24186-1

 

Description 

Maintenance interval 

 

 

Monthly 

Every  

3 months 

Once  

a year 

 

Fan and electric motor of the fan 

 

 

 

1.1.11 

Check the drainage for function 

 

 

×

 

6.1.1 

Check to dirt, damage, corrosion and fastening 

 

×

 

 

6.1.2 

Functional cleaning 

 

 

×

 

10.1.6 

Check the terminals for tightness 

 

 

×

 

10.1.9 

Test the fan for function und operational readiness 
(test run app. 15 min.) 

 

×

 

 

6.1.4 

Check the bearings for noise 

 

 

×

 

10.1.3 

Check  impeller for direction of rotation (all speed) 

 

 

×

 

6.1.3 

Check impeller if damaged or unbalanced (if neces-
sary provide vibration measurement) 

 

 

×

 

10.1 

Functional test of automatically bridging of all ther-
mal and overcurrent protective devices 

 

×

 

 

10.1.7 

Measure the current 

 

 

×

 

10.1.12 

Test function of protective device 

 

×

 

 

 

Triggering device 

 

 

 

 

Check it for function 

×

 

 

 

 

Test of functions 

 

 

 

 

Test all functions of system from control panel as 
well as  signal lights 

×

 

 

 

 

Test of hatch opening/closing 

 

 

 

 

Check the joints of actuator and hatch cover are 
properly fastened 

 

×

 

 

 

Check if smoothly opens/closes 

 

×

 

 

 

Check the safety measures (protective elements, 
signs, guards) 

 

×

 

 

 

Accessories (air ducts, air louvers, flaps, sound at-
tenuators) 

 

 

 

5.5.1 

Check accessible ducts inclusive fire protective insu-
lation and fastening for outside damages and corro-
sion (visually) 

 

 

×

 

5.5.4 

Check accessible flexible connections for tightness 
(visually) 

 

 

×

 

5.2.1 
5.2.3 

Flaps and sound attenuators check for dirt, damage 
and corrosion  
Check mechanical functionality of the flaps 

 

 

×

 

5.1.1 

Check air louvres for dirt and damage (visually) 

 

 

×

 

 
10.4 

Spare parts 

In case of order of spare parts please specify the serial number of the fan. You can find it on the nameplate or in the 
test protocol. 

Spare parts: electric motor (there is a restriction to use only from the test lab allowed motors), impeller, service 
switch, casing. 

How to replace electric motor, impeller or actuator - please contact manufacturer for instructions. 

 

Содержание DVV-XL

Страница 1: ...DVV DVVI XS XM XL XP Installation and Operating Instructions for English original version...

Страница 2: ...with Systemair also for the event of applications for protective rights Any powers of use such as copying and forwarding rights are with us An exemplary configuration has been shown on the title page...

Страница 3: ...connection 9 7 1 Residual current circuit breaker 10 7 2 Connection of thermal protection 10 8 Commissioning 10 8 1 Preconditions 10 8 2 Safety elements 11 8 3 Commissioning 11 9 Operation 11 9 1 Safe...

Страница 4: ...f injurie from rotating parts if not covered with protective grid This warning identifies situations with a danger for life from touching impeller Failure to comply with this warning leads to the risk...

Страница 5: ...sonal protective equipment Depending on object additional protective equipment may be necessary Safety components must not be by passed or put out of function Keep all the warning signs and nameplates...

Страница 6: ...uilding structure and equipment against excessive temperatures and decrease fire escalation to the surrounding areas Snow load classification SL 0 suitable for installation only on the top of heated b...

Страница 7: ...vets screws or covering caps WARNING Electrical hazard from damaged connection cable or connections Do not use the connection cable service switch or impeller for transport or hoisting WARNING Hazard...

Страница 8: ...on request recommended factory mounted as DVVI fan DVV DVVI fans can be also equipped with accessory FSL factory mounted recommended 5 1 Technical data Size DVV XS XM XL XP Max synchron RPM at 50 or...

Страница 9: ...casing at installation The fans shall be fixed to the base with 4 screws in the corners Ensure unobstructed and uniform intake into the fan as well as free outlet Install connecting ducts and accesso...

Страница 10: ...cal expert disconnect from the power supply all pole prevent switching on again test absence of voltage earthing and short circuiting protect adjacent live parts by covers and barriers and fit a suita...

Страница 11: ...ing by trained and instructed qualified personnel only Switch the ventilator on as planned WARNING Hazard from bursting parts When checking the direction of rotation wear safety goggles Check the dire...

Страница 12: ...rly important if the supply cable is long but also to reduce the motor noise Filters may only be aban doned if proven that the voltage peaks on the connection terminals of the fan are inside stress ca...

Страница 13: ...maintenance troubleshooting cleaning and service Observe 5 safety rules for the electrical expert disconnect from the power supply all pole prevent switching on again test absence of voltage earthing...

Страница 14: ...The actual pressure drop of the system is higher than supposed the fan could operate in an unsta ble area of the fan curve Check operating point and system design Consult cus tomer service of the man...

Страница 15: ...tem from control panel as well as signal lights Test of hatch opening closing Check the joints of actuator and hatch cover are properly fastened Check if smoothly opens closes Check the safety measure...

Страница 16: ...ng Dismount carefully WARNING Hazard from falling parts When selecting the hoisting device observe the weight weight information on the name plate Carefully disconnect all wires Remove the fan from du...

Страница 17: ...DVV 16 08 2021 17 Appendix 1 Dimensions...

Страница 18: ...18 DVV 16 08 2021 Appendix 2 Installation examples...

Страница 19: ...rn the cooling ducts towards each other 2 Mount the fan on the horizontal base base pitch 10 mm m 3 Don t fix the cable on the casing 4 Enable free cooling air inlet and free outlet DVV F400 shown App...

Страница 20: ...eq con operation marking EMC See IMO Chapter 7 Prewired in D inside fan P2 18 5 kW All wires led out to service switch to connect in D on site P2 22 kW 95492 DVV 1000D4 XM F400 IE2 EMC 95448 DVV 1000D...

Страница 21: ...ply d max 10 mmq D max 18 mm 2 M16x1 5 PTC d max 1 5 mmq D max 10 mm 3 M32x1 5 M40x1 5 1 2 3 1 2 3 1 2 3 DVV 800D4 XS 4 6 XS DVV 800D6 8 XL DVV 1000D6 XL 6 XP DVV 1000D6 8 XL 6 12 XL DVV 800D4 XL 4 6...

Страница 22: ...hinery Electrical equipment of machines Part 1 General requirements EN 12101 3 Smoke and heat control systems part 3 Specification for powered smoke and heat exhaust ven tilators complies with the pro...

Страница 23: ...o prevent hazard zones being reached by upper and lower limbs EN 60204 1 Safety of machinery Electrical equipment of machines Part 1 General requirements Note1 Compliance with EC Machinery Directive a...

Страница 24: ...achinery Electrical equipment of machines Part 1 General requirements EN 12101 3 Smoke and heat control systems part 3 Specification for powered smoke and heat exhaust ven tilators complies with the p...

Страница 25: ...istances to prevent hazard zones being reached by upper and lower limbs EN 60204 1 Safety of machinery Electrical equipment of machines Part 1 General requirements Note1 Compliance with Supply of Mach...

Отзывы: