Electrical data on the fan nameplate have to comply with the provided mains connection. 

Motor protection has to be provided by the installer. 

 

 

 

If fan used for smoke and heat extract in case of fire switch to fire mode 
(max. speed, disabled protection of controller and motor)  and bridging of 
motor protective devices is necessary to assure operation.  

Switching on max. speed even after eventual short supply cut off must be assured. 

Operating over 1400 to 1500 RPM (size 800: 850 RPM) is not allowed. 

 

 
5.0 COMMISSIONING 

 

Before initial operation, read through appropriate instructions and check the following: 

  

  Assembling of the fan (fixing, eventual deformations);  

  Check all joints for leakage; 

  Check if foreign objects were left in the fan or in the connected ducts; 

  Check if protective elements are fitted; 

  Check the accuracy of the electric wiring and connections to the mains. 

 

Then start the fan for a short period and switch it off again to check the direction of rotation. 

It has to comply with the direction of the arrow on the casing of the fan. Check it for proper 

operation (smoothly rotating impeller, current, eventual vibrations, noise). 

 

 

Protective glasses are needed to avoid any injury of the eyes. 
 

 

 

Fill in attached control report and file it.  
 

 

 

6.0 APPROVAL  

 

 

It  is  particularly  important  to  prove  the  proper  function  of  system  and 
control devices as well as compliance with requirements of the project and 
regulations.  

 

When  the  system  is  approved,  file  the  reports.  Make  sure  that  only 
authorised personnel can handle with on/off switch. 

Содержание DVG-H-EC F200

Страница 1: ...maintenance of roof fans DVG EC Appendixes 1 Mounting of service switch Mounting of vertical outlets for DVG V 3 4 Accessories mounting 5 Bridges in controller and wiring schemes Controller Compacto i...

Страница 2: ...allation 4 4 2 Safety instructions for installation commissioning maintenance and controlling 4 4 3 Installation of the fan 4 4 4 Instructions for installation 5 5 0 COMMISSIONING 6 6 0 APPROVAL 6 7 0...

Страница 3: ...he risk for this carries the operator alone 2 0 TECHNICAL DESCRIPTION Casing Electric motor with impeller is fastened to a sturdy supporting construction The casing cover is made of see water resistan...

Страница 4: ...protective guard EN 13857 After installation impeller must not be accessible anymore During installation commissioning maintenance and controlling unauthorized personal should not have access to the f...

Страница 5: ...qualified electrician In case of unprofessional connection guarantee will not be valid The risk for this carries the operator alone Observe attached detailed instructions of motor and controller suppl...

Страница 6: ...oints for leakage Check if foreign objects were left in the fan or in the connected ducts Check if protective elements are fitted Check the accuracy of the electric wiring and connections to the mains...

Страница 7: ...not deviate from the starting values at installation In case that parameters deviate the electric motor or the impeller have to be replaced or repaired This must only be done by an authorised customer...

Страница 8: ...acturer 9 0 GUARANTEE Guarantee will be valid only if transport storage installation connection and periodical maintenance have been executed in compliance with the above instructions and local regula...

Страница 9: ...age des Revisionsschalters Montage der Umlenkungsbleche bei DVG V Appendix 1 Mounting of service switch Mounting of vertical outlets for DVG V Bilaga 1 Beslag av tj nste kopplar beslag av lodlinjeutta...

Страница 10: ...Zubeh r Montage Appendix 3 Accessories mounting Bilaga 3 Tillbeh r installation 3 DVG H SSG F ASG F VKG F ASSG F DVG H VKG F ASSG F FDG F DVG H VKG F SSG F ASG F ASSG F DVG H VKG F SSGE F FDGE F ASG...

Страница 11: ...Zubeh r Montage Appendix 4 Accessories mounting Bilaga 4 Tillbeh r installation 4 DVG V SSG F ASG F VKG F ASSG F DVG V VKG F ASSG F FDG F DVG V VKG F SSG F ASG F ASSG F DVG V VKG F SSGE F FDGE F ASG...

Страница 12: ...6 7 at 3 controller and connect potentiometer R 1k according to wiring scheme For fan speed setting using AN1 input 0 10V remove bridge 9 10 6 7 at 3 controller and connect 0 10V input according to w...

Страница 13: ...DVG 355 355 EC DVG 450 EC Wiring 1 230V 50 60Hz 27 11 2013...

Страница 14: ...DVG 560 EC DVG 630 EC DVG 630 EC DVG 800 EC Wiring 3 400V 50 60Hz 27 11 2013 27 11 2013...

Страница 15: ...03 2012 DVG EC overensstammer med bestammelserna i testrapporter fran LGAI Technological Center S A Bellaterra Barcelona nr 09 100216 502 av den 12 juni 2009 och nr 11 2673 1035 av den 14 juni 2011 D...

Отзывы: