Annex
9—32
Fig. 2
By
delivery
of
a
DVC
module
with
divided
rotor,
the
motor
is
installed
before
delivery
to
the
customer
Fig. 3, 4 and 5
The
motor
and
console
is
secured
to
the
motor
plate
by
4
shock
absorbers
mounted
by
M8
bolts.
Fig. 2 og 6
The
drive
belt
must
be
placed
around
the
rotor
and
in
the
center
position
of
the
rotor.
Observe
brackets
for
assembly
of
the
rotor
segments.
Fig.2
Fig.3
Fig.4
Fig.5
Fig.6
Содержание Danvent DV
Страница 28: ...Bilag 8 8...
Страница 33: ...Annex 9 5...
Страница 34: ...Annex 9 6 A1 Size Quantity Length mm DV 60 4 1014 DV 80 4 1164 DV 100 4 1314 DV 120 4 1464 DV 150 4 1614 A1...
Страница 36: ...Annex 9 8 9 3 Assemble divided rotor for DV 60 DV 80 DV 100 DV 120 og DV 150...
Страница 37: ...Annex 9 9...
Страница 38: ...Annex 9 10...
Страница 39: ...Annex 9 11...
Страница 40: ...Annex 9 12...
Страница 41: ...Annex 9 13...
Страница 42: ...Annex 9 14...
Страница 43: ...Annex 9 15...
Страница 44: ...Annex 9 16...
Страница 45: ...Annex 9 17...
Страница 46: ...Annex 9 18...
Страница 47: ...Annex 9 19 9 4 Assemble divided rotor for DV 190 og DV 240...
Страница 48: ...Annex 9 20...
Страница 49: ...Annex 9 21...
Страница 50: ...Annex 9 22...
Страница 51: ...Annex 9 23...
Страница 52: ...Annex 9 24...
Страница 53: ...Annex 9 25...
Страница 54: ...Annex 9 26...
Страница 55: ...Annex 9 27...
Страница 56: ...Annex 9 28...
Страница 57: ...Annex 9 29...
Страница 58: ...Annex 9 30...
Страница 71: ...Annex 12 3...
Страница 75: ...Annex 12 7...
Страница 76: ...Annex 12 8 Systemair A S Ved Milep len 7 DK 8361 Hasselager Tel 0045 8738 7500 www systemair dk...