Conformance to Shipbuilding Standards
22
NA-series Programmable Terminal Hardware User’s Manual (V117)
Certification Zones for Shipping Standards
a. Deck zone
b. Zones with and without air conditioning on the bridge (e.g., helm room)
c. Depends on the ship type. Emergency power supply devices on bulk carrier ships carrying lique-
fied gas or hazardous chemicals.
d. Engine room zone (devices mounted on machinery that has strict vibration conditions, such as
diesel engines or air compressors)
e. Zones with and without air conditioning not on the bridge or deck (e.g., boiler room)
NA Unit Certification Zones for Shipping Standards
Precautions for Compliance with Shipping Standards
1. Always install the NA Unit in a control panel.
2. Install the NA Unit in a control panel that has air conditioning.
3. Completely shield the gap at openings in the control panel or operation panel with a gasket.
4. The following noise filter must be connected to the 0-VDC to 24-VDC power supply line.
Stan-
dards
a. Deck
b. Bridge
c. Ship
type (e.g.,
bulk ship
with lique-
fied gas)
d. Engine
(e.g.)
e. Not on deck or bridge
No air con-
ditioning
With air
condition-
ing
No air con-
ditioning
With air
condition-
ing
NK
Uncertified
Certified
Certified
Uncertified
Uncertified
Certified
Certified
LR
Uncertified
Certified
Certified
Uncertified
Uncertified
Certified
Certified
DNV·GL
Uncertified
Certified
Certified
Uncertified
Uncertified
Certified
Certified
RINA
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
BV
Uncertified
Certified
Certified
Uncertified
Uncertified
Certified
Certified
ABS
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
KR
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
CR
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Uncertified
Manufacturer
Schaffner
Model
FN-2080-XX
a. Deck
d. Engine room
Ocean
Devices on deck or bridge
Devices not on deck or bridge
e. Boiler room
Air conditioning
No air conditioning
b. Bridge
Air conditioning
No air conditioning
c. Depends on ship type
Emergency power supply devices on
bulk carrier ships carrying liquefied
gas or hazardous chemicals
Содержание OMRON NA Series
Страница 8: ...Sections in this Manual 6 NA series Programmable Terminal Hardware User s Manual V117...
Страница 12: ...CONTENTS 10 NA series Programmable Terminal Hardware User s Manual V117...
Страница 34: ...Revision History 32 NA series Programmable Terminal Hardware User s Manual V117...
Страница 82: ...3 Installation and Wiring 3 22 NA series Programmable Terminal Hardware User s Manual V117...
Страница 164: ...5 Troubleshooting 5 18 NA series Programmable Terminal Hardware User s Manual V117...
Страница 179: ...I 1 I NA series Programmable Terminal Hardware User s Manual V117 Index...
Страница 181: ......