48
Synthes
USS II
Handling technique
4
Distract cross-link assembly (optional)
Loosen one of the set screws, place the holding forceps next
to the clamp and carry out the distraction with the spreader
forceps.
Re-tighten the set screw tightly with the small hexagonal
screwdriver.
Connecting Two Rods
Variation A: Connecting Two Rods
with 6 mm Cross-link Clamps
Содержание USS II
Страница 73: ...Synthes 71 ...
Страница 75: ......