Slide the antenna bolts through the holes in the mounting bracket, then attach the antenna
to the bracket, using the provided three nuts and three lockwashers.
3
Using a plumb line or bubble level, ensure the antenna is within 5° of vertical (perpendicular
to the horizon), and tighten the mounting bracket bolts.
4
Bolt the lightnin
g
suppressor mounting plate to a flange that is attached to a valid earth
ground. The roof ring ground system, a Central Office groundin
g
plate, and building
structural steel are examples of valid earth ground points. If the mounting plate cannot be
bolted to a valid earth ground, bolt the mounting plate to a point within 15 ft. of the chosen
valid earth ground. If the mounting plate is to be installed in a nonmetallic junction box,
perform the installation, and bolt the assembly near the chosen valid earth ground.
Procedure B
.
Antenna Mounting and Cable Connection (continued)
Step
Procedure
Содержание TimeSource 3000
Страница 1: ...TimeSource 3000 GPS Primary Reference Source 097 72000 02 Issue 6 October 2003 ...
Страница 47: ...3 Chapter Installation This chapter provides the steps required for installation and power up ...
Страница 107: ...Chapter 4 TL1 Reference This chapter provides information for using the TL1 language ...
Страница 203: ...Chapter 6 Specifications This chapter provides equipment specifications ...