13
STEP 1
1. Assemble Frame A as shown above.
Note:
Tap each T-Nut into its pre-drilled hole until the metal tangs sink fully into the wood.
Flush
FRAME A
6’’
6’’
1-1/2’’
BOTH
SIDES
PF 6063 3/4’
’ x 3-3/8’
’ x 59-5/8’
’
A-FRAME BASE
PF 6010 1’
’ x 3-3/8’
’ x 47-1/2’
’
PF 6006 3/4’
’ x 3-3/8’
’ x 44-1/2’
’
PF 6164 3’
’ x 3’
’ x 94’
’
PF 6164 3’
’ x 3’
’ x 94’
’
2-1/2” Deck Screw (x14)
(3)
2-1/2’’ Screws
(3)
2-1/2’’ Screws
(2)
2-1/2’’ Screws
FS2828
1-3/4
FS2826
1-1/4
FS2827
1-5/8
FS2829
2
FS2830
2-1/2
FS2831
3
FS2826
3/4
Hint!! Use parts from your Tower Box.
T-Nut
Small
(2)
2-1/2’’ Screws
5/16-18 X 4’’ Hex Head Bolt
59-1/4’’
47-1/2’’
5/16’’ Washer
5/16’’Loc-Washer