[3.2.6] Roof Bar Installation
1
1.75”
4
5
7
8
2
3
STEP 1: Snap horizontal line with chalk
line.
STEP 2: Remove tile.
STEP 3: Use studfinder and measuring
tape to find rafters.
STEP 4: Drill two pilot holes (1/4” diameter)
for the lag bolts 1.75” apart. Backfill with
sealant.
STEP 5: Line up pilot holes witht roof bar
holes.
STEP 6: Insert lag bolts through 5/16” SS
flat washers and into rafter.
6
STEP 7: Tighten lag bolts using a 5/16”
socket wrench to between 100-140 inch
pounds depending on the type of wood
and time of year.
STEP 8: Reinstall tile. Underside of roof tile
may have to be notched in order to seat
flush onto roof bar.