[3.2.5] Flashed L-feet Installation
REQUIRED INSTALLATION TOOLS: Tape measure, chalk line, stud finder, caulking gun, sealant compatible with roofing
materials, drill with 1/4” long-style bit, socket wrench or impact gun with 5/16” deep socket
1
3
4
6
STEP 1: Locate the rafters and snap hori-
zontal and vertical lines to mark installation
position for each flashing.
STEP 4: Line up pilot hole with high profile
L-feet hole.
STEP 2: Drill a pilot hole (1/4” diameter)
for the lag bolt. Backfill with sealant.
STEP 5: Insert lag bolt through L-feet,
flashing and pilot hole.
STEP 3: Insert the flashing so the top
part is under the next row of shingles and
pushed far enough up slope to prevent
water infiltration through vertical joint in
shingles. Line up flashing hole with pilot
hole.
STEP 6: Tighten lag bolt to 100-140
torque inch pounds depending on the
type of wood and time of year. If using an
impact gun be careful to not over torque
the fastener. You may need to stop and
use a hand ratchet to finish the installation.
5
2
WARNING: Flashed L-feet Products are NOT designed for and should NOT be used to anchor
fall protection equipment