![Swegon GOLD LP Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/swegon/gold-lp/gold-lp_operation-and-maintenance-instructions_1413554005.webp)
GB.GOLDLP.170830
www.swegon.com 5
We reserve the right to alter specifications without notice.
2
SAFETY PRECAUTIONS
All staff concerned must acquaint themselves with these
instructions before beginning any work on the unit. Any
damages to the unit or parts of it due to improper han-
dling or misuse by the purchaser or the fitter cannot be
considered subject to guarantee if these instructions have
not been followed correctly.
Warning
Only a qualified electrician or service personnel
trained by Swegon shall be permitted to modify
the air handling unit in conjunction with electrical
installations or the wiring of external functions.
2.1 Safety Isolating Switch/Main Switch
On the GOLD LP one-piece unit, the safety isolating switch
is externally positioned on the electrical equipment cubi-
cle.
The air handling unit must normally be started and
stopped from the hand-held micro terminal; not by
switching the safety isolating switch on and off.
Always switch off the safety isolating switch before serv-
icing the unit if not otherwise specified in the pertinent
instructions.
2.2 Risks
Warning
Before carrying out any work, make sure that the
power supply to the air handling unit has been
switched off.
Risk areas with moving parts
Typical moving parts are fan impellers and drive pulleys of
the rotary heat exchanger.
Inspection panels can only be opened using a special key,
they therefore function as safety guards for fans and the
heat exchanger. If the ducts are not connected to the fan
outlets, the outlets must be fitted with a safety guard
(wire mesh screen).
Warning
The inspection panels on the filter/fan sections must
not be opened while the unit is in operation.
Under normal operating conditions, use the stop
button on the hand-held terminal to stop the air
handling unit.
Wait until the fans have stopped rotating before
opening the inspection panel.
The air pressure inside the fan section is positive,
which means that the door can fly open.
2.3 Safety Guards
The lockable inspection panels serve as a safety guard for
the fans/heat exchanger.
The cover over the power supply unit in the electric equip-
ment cubicle serves as a safety guard for this unit.
Only a qualified electrician or trained service technicians
shall be allowed to remove the safety guards.
Warning
The power supply to the unit shall be isolated by
switching off the safety isolating switch before
removing the safety guard.
All the inspection panels must be closed and the
cover of the electrical equipment cubicle must be
fastened while the air handling unit is operating.