
Section IV: Maintenance
4.0.MAI.SL-214
ADJUSTMENT
Should the jib lockout valve need adjustment the first step will be to loosen the mount bracket
screws (see illustration above). Reposition the jib lockout valve with respect to the valve ramp
by turning the adjustment screw on the valve mount bracket as follows:
Clockwise Adjustment – Moves the jib lockout valve closer to the valve ramp
Counter-Clockwise Adjustment – Moves the jib lockout valve away from the valve ramp
Once the valve has been moved back into proper adjustment, then tighten up the mount bracket
screws.
PART NUMBER &
SPECIFICATION
SwapLoader
Pt. No.
Work Port Size
Spool Type
21P28
3/4-16 ORB (SAE 8) 2-Way, 2-Position N.C.
Please contact your SwapLoader Distributor or SwapLoader USA should you have any
questions regarding this procedure.
4-6
Содержание SL-214
Страница 1: ...Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 214...
Страница 2: ......
Страница 30: ...This Page Intentionally Left Blank...
Страница 40: ...This Page Intentionally Left Blank...
Страница 46: ...This Page Intentionally Left Blank...
Страница 51: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 39...
Страница 52: ...This Page Intentionally Left Blank...
Страница 56: ...This Page Intentionally Left Blank...
Страница 64: ...This Page Intentionally Left Blank...
Страница 68: ...Section IV Maintenance 4 0 MAI SL 214 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2...
Страница 78: ...This Page Intentionally Left Blank...
Страница 90: ...This Page Intentionally Left Blank...
Страница 105: ......
Страница 106: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000...